My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/20/2024
CBCC
>
Meetings
>
2020's
>
2024
>
02/20/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 11:51:43 AM
Creation date
3/21/2024 11:43:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/20/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EARTH TECH <br />DRILLING <br />Environmental / Geotechnical <br />954-974-2424 <br />2703 NW 19th Street, Pompano Beach, FL 33069 <br />Monitoring Wells Sparge Wells Direct Push <br />Geotechnical Drilling SONIC Drilling <br />DATE 1/3/2024 <br />CLIENT: Geosyntec I <br />Joshua Udvardy PHONE (561) 922-1102 <br />SITE: Indian River County Landfill -1325 74th Ave SW - Vero Beach, FL <br />PROPOSED SCOPE OF WORK: <br />Client to provide access to water source <br />(Hand clear ALL locations to 5' or Refusal) <br />(4) MW 2" x 20'w/ 10'.010" Screen (20/30 Sand) - 4" AGP Completion w/ 4 Bollards - 1/2 Hr Well Development <br />(4) MW 2" x 40'w/ 5'.010" Screen (20/30 Sand) - 4" AGP Completion w/ 4 Bollards - 1/2 Hr Well Development <br />(1) PZ 2" x 15'w/ 10'.010" Screen (20/30 Sand) - 4" AGP <br />Completion w/ 4 Bollards - 1/2 Hr Well Development <br />Drum Soil - Discharge Water onsite <br />Soil Cores on Intermediate Wells and PZ. <br />SONIC DRILLUnit <br />Unit <br />Rate <br />Number <br />of Units <br />Extended Price <br />Sonic Daily Rate (Compact Track) Price Includes a ten hour workday (7 to 5) <br />Sonic Daily Rate <br />8" Sonic Sonic Casing <br />Compact Track Loader / Water Support <br />Unless otherwise stated in this quote. <br />per day $3,900.00 3 <br />$11,700.00 <br />$0.00 <br />perfoot $25.00 0 <br />$0.00 <br />$0.00 <br />I per day 1 $575.00 1 3 <br />$1,725.00 <br />WELL MATERIALS <br />1" PVC Well Material (includes all annular backfill) <br />perfoot <br />$0.00 <br />2" PVC Well Material (includes all annular backfill) <br />perfoot $16.00 255 <br />$4,080.00 <br />4" PVC Well Material (includes all annular backfill) <br />perfoot <br />$0.00 <br />Bentonite Pellets (Estimated 6 buckets per location) <br />bucket <br />$0.00 <br />$0.00 <br />Well Completion (includes 30 min. development, bolt -down manhole, concrete pad(2'x2' or 10" circle) & lockable well cap <br />8" Bolt -down completion <br />12" Bolt -down completion <br />PVC Stickup Completion w/ Development <br />4" Above Grade Protector (Aluminum) <br />Bollard <br />per well <br />$0.00 <br />per well <br />$0.00 <br />per well <br />$0.00 <br />per well $310.00 9 <br />$2,790.00 <br />each 1 $125.00 1 36 1 <br />$4,500.00 <br />MISCELLANEOUS <br />Mobilization (Sonic Drill with all associated equipment) <br />roundtrip $1,500.00 1 <br />$1,500.00 <br />Daily Mobilization (to and from site per day) <br />per day <br />$0.00 <br />Per Diem <br />per night. $575:00 3 <br />$1,150.00 <br />Permits <br />each $110.00 2 <br />$220.00 <br />Borehole Abandonment <br />perfoot $12.00 tf <br />$0.00 <br />Water Meter and usage <br />lump sum $1,200.00 0 <br />$0.00 <br />DOT Approved 55 -gal Drum (As Needed) <br />each $80.00 6 <br />$480.00 <br />$0.00 <br />Additional Well Development <br />1/2 hour $85.00 0 <br />$0.00 <br />Onsite Pre -Drill Meeting <br />each <br />$0.00 <br />Standby / Difficult Moving Time <br />per hour $550.00 <br />$0.00 <br />Days to Complete Scope of Work <br />3 <br />Submitted By: Cha4,*1e*'8UC4Wr C'8TOTAL QUOTE PRICE <br />$28,145.00 <br />251 <br />
The URL can be used to link to this page
Your browser does not support the video tag.