My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/20/2024
CBCC
>
Meetings
>
2020's
>
2024
>
02/20/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 11:51:43 AM
Creation date
3/21/2024 11:43:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/20/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Mr. Quintin Bergman <br />Indian River County Coastal Division <br />1801 27h Street <br />Vero Beach, Florida 32960 <br />Dear Mr. Bergman: <br />7� <br />ECOLOGICAL ASSOCIATES, INC. <br />January 26, 2024 <br />Ecological Associates, Inc. (EAI) is pleased to submit its Scope of Work and Cost Proposal <br />for providing professional environmental services to Indian River County. All conditions <br />related to this proposal shall be governed under EAI's Continuing Contract Agreement for <br />Consulting Environmental, Ecological, and Biological Support Services with the County <br />dated September 26, 2023. <br />The new task is for sea turtle monitoring along approximately 10 miles of beach in support <br />of the County's Habitat Conservation Plan during the 2024 sea turtle nesting season, as <br />described in the Scope of Work presented below. This monitoring will provide baseline <br />data for future beach nourishment projects and support long-term monitoring efforts for <br />sea turtles along the County's beaches. <br />Scope of Work: <br />Task 1: Project Management and Mobilization <br />The Survey Area consists of an approximately 0.6 -mile northern section (FDEP R-17 <br />to R-20) and an approximately 9.5 -mile southern section (R-68 to the Indian River/St. <br />Lucie County Line). Pre-existing survey zone boundaries will be verified and re- <br />marked, and project -specific data sheets and a database will be created. EAI will install <br />signs, posts, and hardware provided by the County using centimeter accurate RTK <br />units. An EAI project manager will oversee all fieldwork and data management <br />operations, participate in weekly check-in meetings with the County, and consult with <br />the County on monitoring requirements, as necessary. A project schedule, as well as <br />field survey schedules, will be created and maintained throughout the life of the project. <br />All equipment and supplies necessary to successfully implement this Scope of Work <br />are available. <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.