My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/20/2024
CBCC
>
Meetings
>
2020's
>
2024
>
02/20/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 11:51:43 AM
Creation date
3/21/2024 11:43:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/20/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Board of County Commissioners <br />THROUGH: John A. Titkanich, Jr., County Administrator <br />THROUGH: Eric Charest, Interim Natural Resources Director <br />FROM: Quintin Bergman, Coastal Resources Manager <br />SUBJECT: Work Order No. 2018006-18 — APTIM, <br />2024 Environmental Monitoring - Sector 3 Hurricanes Ian and Nicole <br />Dune Renourishment <br />DATE: February 2, 2024 <br />DESCRIPTION AND CONDITIONS <br />M <br />On January 9, 2018, the Board of County Commissioners (BCC) approved a contract with Aptim <br />Environmental & Infrastructure, Inc. (APTIM) for professional coastal engineering and biological <br />support services related to the management and nourishment of Sector 3 (Wabasso Beach). The <br />Sector 3 project area is a critically eroded 6.6 -mile section of engineered shoreline that extends <br />from the Seaview Subdivision south past the Turtle Trail beach park. The Sector 3 coastline <br />suffered significant storm related losses to the beach and dune system from the impacts of <br />Hurricanes Ian (2022) and Nicole (2022) creating the need for repair. <br />On November 7, 2023, the BCC awarded Bid No. 2024004 to Dickerson Infrastructure, Inc. dba <br />Dickerson Florida, Inc. for the Sector 3 Hurricanes Ian and Nicole Dune Renourishment Project. <br />The project started construction on December 1, 2023, and is currently still being constructed <br />with an estimated completion date of April 30, 2024. The project consists of a dune restoration <br />project that is placing approximately 274,368 cubic yards of beach compatible sand fill and <br />installing approximately 728,633 native dune plants along the shoreline in Indian River County <br />from FDEP range monuments R20 to R55. <br />Regulatory permits issued for the beach restoration activities identify post -construction related <br />environmental monitoring to be performed on a set schedule for several years following <br />completion of construction. These environmental monitoring activities are evaluated to <br />demonstrate compliance with permit conditions. In the case of the Sector 3 Hurricanes Ian and <br />Nicole Dune Renourishment Project, post -construction nearshore hardbottom, escarpment <br />monitoring, sea turtle, and shorebird nest monitoring is required. <br />54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.