Change Order
Approved Date
04/18/2000
Control Number
2000-123
Agenda Item Number
11.H.1.
Entity Name
Camp Dresser & McKee, Inc.
Subject
Change Order No. 2 Central Region WWTF Expansion
Partial Reconciliation & Additional Engineering Amendment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 Description: Delays associated with hurricane preparation and workforce <br />availability. <br />Purpose: Extension associated for time lost due to hurricane preparations <br />and work force availability. <br />Cost: $0.00 <br />Time: 60 days (PC, SC & FC) <br />11 Description: Additional 8 -inch tee and plug valve. <br />Purpose: Provision for return activated sludge routing to existing septage <br />facility by County staff. <br />Cost: $3,440.00 <br />Time: 0 <br />12 Description: Canopy at sodium hypochloride equipment. <br />Purpose: To enclose the equipment from the weather/ sunlight. <br />Cost-. $1,371.50 <br />rez74o <br />Time: 0 <br />