Laserfiche WebLink
LM <br />D. The ENOMER shall report the status of this PROJECT to the Director of Public Works Department <br />upon request and hold all work open to the inspection of the Director or his authorized agent at any <br />time, upon reasonable request. <br />E, TASK 03 PROJECT DEEJNrI'ION <br />a) The ENGINEER shall derive and draft an outline of the pre -construction monitoring plan alit, <br />protocols to be followed for this PROJECT, <br />b) The ENGINEER shall solicit competitive bids for the analytical services to be performed for <br />this PROJECT. <br />C) The ENGINEER, with review and approval from the COUNTY, shall hire stub -consultants to <br />+, perform sampling (as necessary) and analytical services to complete this task. <br />d) The ENGINEER shall: conduct composite stormwater and sediment sampling; coordinate <br />benthic sampling; identify analytical protocols; disseminate the reporting necessary to complete this <br />task. <br />e) The ENGINEER shall conduct discussions with RD.E,P. and St, Johns River Water <br />Management District and prepare a draft Surface Wetter Quality Monitoring Plan for determining post- <br />construction PROJECT effec(iveness. <br />f) The ENGINEER shall review the draft Surface Water Quality Monitoring Plan with the <br />COUNTY and revise the plan as necessary prior to submittal for final plan approval from the F.D.F.T. <br />and St. Johns River Water Management District. <br />SECTION IV - TIMI; FOR COMPLETION <br />A. All pre -construction sampling is expected to occur between April 24, 20M and July 1, 21}00 in <br />accordance with the FDEP Grant requirements. ENGINEER will then work with the analytical data to <br />develop BMPs and a Surface Water Quality Monitoring Plan prior to March 1, 2001. <br />SECTION V - COMPENSATION <br />The COUNTY agrees to pay, and the ENGINEER agrees to accept fee for services rendered according <br />to the Scope of Services, Task 03, identified in Section IiI of this work order with a maximum charge under this <br />work order of $15,480.00. This fee is itemized as follows: <br />A. Draft Outline of Pre -Construction Monitoring Plan $ 1,595.00 <br />B. Solicit Bids for Analytical and Sampling Services $ 880.00 <br />C. Sub -consultants <br />a) Benthic Macroinvertebrate Testing ( 1 time, 3 locations) $ 6,200.00 <br />b) Sediment Quality Analysis( I time, 3 locations) $ 795.00 <br />c) Surface Water Analysis (3 times, 3 locations) $ 1,080.00 <br />D. Conduct Sampling, Coordinate Analysis and Reporting $ 11815.00 <br />E. Prepare Draft of Jost -Construction Surface $ 1,745,00 <br />Water Quality Monitoring Plan <br />' F. Coordinate with F.D.E.P., St. Johns River Water $ 1,370.00 <br />Mgmt. District, and County to finalize Post -Construction <br />Surface Water Quality Monitoring flan <br />TOTAL $15,480.00 <br />3:LCYNtEN4PRpl1SRCSiormwirMginllrnprovc%VcroLkFslnlcsliRC•WRK ORDEN NO • TASK Idoc Pagc 2 cry <br />Revised 4111 AV <br />