My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-131
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 2:13:22 PM
Creation date
3/22/2024 2:13:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
05/02/2000
Control Number
2000-131
Agenda Item Number
11.G.4.
Entity Name
Carter Associates, Inc.
Subject
Work Order No. 7 for Vero Lake Estates Stormwater Improvements, Phase I
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />4w <br />EXHIBIT A <br />ITEMIZED MAN-HOUR ESTIMATE <br />TASK 3, VERO LAKE ESTATES <br />STORMWATER IMPROVEMENTS, PHASE 1 <br />WORK ORDER NO.7 <br />INDIAN RIVER COUNTY PROJECT NO. 9219 <br />April, 2000 <br />A. Draft Outline of Pre -Construction Monitoring Plan <br />Engineer I I hr. x $115 — $ 115.00 <br />Engineer II 16 hrs. x $ 85 — $ 1,350.00 <br />Word Processor 4 hrs x $ 30 = $ 120.iH1 <br />$ 1,595.00 <br />B. Solicit Bids <br />Engineer lI 4 hes. x $ 85 $ 340.00 <br />Engineer Ill 8 hrs. x $ 60 = $ 480.00 <br />Word Processor 2 hrs. x $ 30 <br />$ 880.00 <br />C. Sub -Consultants <br />a) Benthic Macroinvertebrate Testing (1 time, 3 locations) <br />$ 6,200.00 <br />b) Sediment Quality Analysis ( 1 time, 3 locations) _ <br />$ 795.00 <br />c) Surface Water Analysis (3 times, 3 locations) — <br />1,989.0[1 <br />$ 8,075.00 <br />D. Coordinate and Conduct Sampling, Coordinate Analysis and Reporting <br />Engineer I 1 hr. x $11.5 — <br />$ 115.00 <br />Engineer It 8 hrs. x $ 85 — <br />$ 680.00 <br />Engineer Technician 18 hrs. x $ 50 = <br />$ 900.00 <br />Word Processor 4 hrs x $ 30 r <br />120.00 <br />$ 1,815.00 <br />E. Draft Post -Construction Surface Water Quality Monitoring Plan <br />Engineer I 1 hr. x $115 — <br />$ 115.00 <br />Engineer II 16 hrs. x $ 85 = <br />$ 1,350.00 <br />Word Processor 3 hrs. x $ 30 = <br />$ 90.00 <br />Drafting 4 hrs. x $ 45 — <br />18000 <br />$ 1,745.00 <br />P. Coordination with F.D.E.P., St. Jahns R.W.M.D. And County <br />to finalize Post -Construction Surface Water Quality Monitoring <br />Plan <br />Engineer 1 2 hrs. x $115 <br />$ 230.00 <br />Engineer II 12 hrs. x $ 85 — <br />$ 1,020.00 <br />Word Processor 4 hrs, x $ 30 _ <br />120. 0 <br />$ 1,370.00 <br />TOTAL, $15,480.00 <br />1;ICYNXENGPROAtRCStormwtrMgmtlmprovcXVcrol.kGstates1Ex111BIT A-Itemk(I Kin-flour-'raskMoc Page 1 of 1 <br />Revised 4111100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.