My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-132
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 2:15:27 PM
Creation date
3/22/2024 2:15:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
05/02/2000
Control Number
2000-132
Agenda Item Number
11.H.1.
Entity Name
Camp Dresser & McKee, Inc.
Subject
Engineering Services Work Autorization for South County Water Treatment Plant
Well System Evaluation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CA <br />40 <br />r <br />0 <br />r� <br />A. Salary Cost Basis with Upper Limit <br />For the Basic Services performed on a salary cost basis with an upper limit, IRC <br />agrees to pay CDM as follows: <br />For engineering services performed by CDM, the payment will be equal to the <br />salary cost of such services for each employee times 2.3 for overread and profit <br />plus actual out-of-pocket expense costs. Salary cost is equal to 1.393 times direct <br />salary costs and is defined as the cost of salaries (including sick leave, vacation, and <br />holiday pay applicable thereto) for time directly chargeable to the project, plus <br />unemployment, excise, and payroll taxes; and contributions for social security, <br />employment compensation insurance, retirement benefits, and medical and other <br />group insurance benefits. <br />Actual out-of-pocket expense costs are all costs other than salary costs that are <br />incurred during the progress of the work. The actual out-of-pocket expense costs <br />include: air fare, automobile rental if required, mileage charges, parking tolls, taxi, <br />meals, lodging, telephone, printing and reproduction costs, and other <br />miscellaneous costs incurred specifically for this project. The maximum cost for <br />blueprint sheets is $110. The maximum cost for mylar sheet is $11.00 .and a sepia <br />sheet is $5.00. The charges for in-house computer program and word processor <br />usage will be at CDM's regular rates. For outside computer services, charges will <br />be made at invoiced cost to CDM. <br />For the basic services performed on a salary cost basis with an upper limit, IRC agrees to <br />provide a written request before work is started by CDM. <br />SUBMITTED BY: <br />CAMP DRFSSFR & McKEE INC. <br />(Consultant) <br />By �_. &" �. <br />E. Lawrence Adams, Jr., Pct. D.E.E. <br />Vice President <br />APPROVED BY: <br />INDIAN RIVER COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />By� Q_ 1L- mom <br />Fran B. Adams <br />Chairman <br />Date it 4,znz Date <br />03033.&& <br />2. 2000 <br />7=1�'�, j <br />
The URL can be used to link to this page
Your browser does not support the video tag.