My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-058
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 12:37:23 PM
Creation date
3/27/2024 12:25:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/05/2024
Control Number
2024-058
Agenda Item Number
8.X.
Entity Name
MBV Engineering, Inc.
Subject
Engineering Services Work Order 2 for Renovation Project for Fire Station 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 2: Environmental Consulting & Dock Permitting <br />The CONSULTANT will provide the following environmental design services: <br />• Shoreline Wetland/Mangrove Inspection and Flagging, as necessary <br />• Submerged Resource Drawing <br />• Seagrass Study (6/1— 9/30) <br />• Depth Contours <br />• Dock Planning and Layout (Structural Engineering by others) <br />• Environmental Resource Permitting <br />• ERP Permit Application and Coordination <br />• General Dock Site Plan Drawing and General Cross Section <br />• Mangrove Trimming Plan if necessary <br />Task 3: Civil Design & Permitting <br />A. Construction Plans <br />The CONSULTANT will prepare 24" x 36" design drawings for the proposed improvements to <br />include the following: Cover Sheet, Existing Conditions Plan, General Notes and Specifications, <br />Erosion Control Plan, Demolition Plan, Site Plan, Grading Plan, Utility Plan, and applicable details <br />sheets. It is understood that the structural design and permitting of the dock will be provided <br />by others and contracted separately with IRC. <br />B. County Reviews <br />The CONSULTANT will attend two (2) progress review meetings with the COUNTY staff at the <br />50 and 100 percent levels of design completion. A single set of review comments shall be <br />provided to CONSULTANT prior/or after each review meeting. This task includes revisions to <br />plans from each COUNTY review within reasonable scope of the project. <br />C. Permitting <br />The Consultant will prepare the following permit applications and associated submittals for the <br />following agencies. Note: Permit Applications will be submitted after addressing the COUNTY's <br />50 percent phase review comments. <br />• City of Vero Beach Code Compliant Application (for CI -M Marina Activity Zoning) <br />• SJRWMD ERP Permit Modification for SJs Permit No. 108150-1 <br />• IRC Fire Prevention <br />The CONSULTANT will prepare all necessary applications and fee requests and provide to COUNTY for <br />signature and check processing. Permit Application Fees will be paid for by COUNTY. <br />Task 4: Cost Estimates <br />The CONSULTANT will prepare an Engineer's Opinion of Probable Costs at approximately 50 and 100 <br />percent levels of design completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.