Laserfiche WebLink
i <br />• <br />Indian River Industrial Contractor <br />gate <br />03/24/00 <br />Attn: Steve Swain <br />P.O. Box 23086 <br />Jacksonville, FL 32241-3086 <br />'Purchase Order: <br />5993-03 <br />Invoice <br />No. 19918 <br />2622000 IN ACCOUNT WITH <br />MASER ENGINEERING <br />AND TESTING, <br />INC. <br />PHONE: (691) 461-7948 3504 INDUSTRIAL 338D <br />STREET <br />FORT PIERCE. FLORIDA 34g4a <br />Re: Central Region WWTP <br />TEST NO. TEST <br />QUANTITY <br />UNIT PACE <br />AMOUNT <br />8.109 Florida Bearing Value <br />1 <br />15.00 <br />15.00 <br />8110 Moisture -Density Relationship <br />1 <br />50.00 <br />50.00 <br />Subgrade <br />Rlll-112 Limerock Bearing Ratio <br />2 <br />150.00 <br />300.00 <br />8113 Moisture -Density Ytelationship <br />1 <br />65.00 <br />65.00 <br />Base <br />R114-116 Density of Soil in Place <br />3 <br />15.00 <br />45.00 <br />Subgrade <br />8117 Density of Sail In Place <br />1 <br />15.00 <br />15.00 <br />Roadway Cut <br />8118-124 Density of Soil in Place <br />7 <br />15.00 <br />105.00 <br />Roadway Cut, Storm Drain <br />R125-129 Density of Soil .in Place <br />5 <br />15.00 <br />75.00 <br />Roadway Cut, Pile Removal <br />TOTAL. Amon Ir DUE THIS INVOICE <br />APPROVED FOR PAYMENT <br />CONE # <br />DATE <br />BY _ .. <br />$670.00 <br />