Laserfiche WebLink
• <br />C-1 <br />0 <br />-POO 00=11we" <br />TehV1**: 50 • Fscdn 1r M4"17 <br />March 6, 2060 <br />This letter shall serve as our cost certification for the site related improvements for the subject <br />project. This cost certification is based on the actual construction cost contracts from Cathco, <br />Inc. to perform the work (see attached). We certify that the construction costs are as follows: <br />GRACE OAKS SLIBDIVISIOtt <br />1. Basic Quote $58,223.00 <br />2. Change Order No. l S 300.00 <br />3. Fire Line Additian10 4.7.00 1. 0 9 2— 7, , 0 <br />4. Waterline Change from 2" to 4" 5 2,215,00 <br />Sub -total S71,665.00 7 <br />15%o Bond Increase <br />$11750.0 <br />A <br />fond. Should you <br />RLNVjb <br />^• <br />MC. ID$n McCoy <br />�'4R <br />R?.1000 <br />Planning Department <br />=. <br />Indian River County <br />�t <br />1840 - 25th Street <br />Vero Beach, FL 329%0 <br />-� B 91911 <br />5ubjcct:Grace Oaks Subdivision <br />R+ mAR <br />IRC #99020172 <br />Indian River County, Florida <br />l C zz <br />Engineer's Project No. 98-533 <br />ENOt� <br />Dear Mr. McCoy= <br />This letter shall serve as our cost certification for the site related improvements for the subject <br />project. This cost certification is based on the actual construction cost contracts from Cathco, <br />Inc. to perform the work (see attached). We certify that the construction costs are as follows: <br />GRACE OAKS SLIBDIVISIOtt <br />1. Basic Quote $58,223.00 <br />2. Change Order No. l S 300.00 <br />3. Fire Line Additian10 4.7.00 1. 0 9 2— 7, , 0 <br />4. Waterline Change from 2" to 4" 5 2,215,00 <br />Sub -total S71,665.00 7 <br />15%o Bond Increase <br />$11750.0 <br />A <br />fond. Should you <br />RLNVjb <br />