Laserfiche WebLink
40 <br />4D <br />40' <br />C. Site visits other than those defined in SCOPE/SERVICES, for the purpose of <br />approving the Contractor's requests for payment. <br />D. Specific additional services that are anticipated as possible /inure needs ttre as <br />follows: <br />1) Engineering services for design and permitting of the master planned <br />wastewater lift station and force main shall he negotiated between CAI and <br />IRCDUS as a separate contract, but will be attached as an addendum to Brad <br />Smith and Associates, Inc.'s contract with the County for (lie work described <br />herein. <br />2) The County may require master planning and land management services for <br />the Jungle Trail corridor. If such services are desired, the cost shall be <br />negotiated as an additional service. <br />3) Grant writing services will be negotiated as an additional service. <br />E. Irrigation Design services. <br />F. Archeological consulting; services. <br />G. Wetland permitting; and/or mitigation services. <br />H. Modifications to proposed loop road alignment after approval. <br />I. Profiles for the proposed loop road. <br />J. Design and permitting for the U.S. Fish & Wildlife: Service's S.R. AIA Connector <br />road. <br />K. Bidding and Construction Phase services by Carter Associates, Inc. <br />L. Certifications to pennitting agencies. <br />M. "As -built" surveys. <br />N. Any additional survey work beyond that described under "Task 1. <br />Initial her (Landscape Architect) (County) <br />MMMMMMM <br />'11WMEM <br />�t;;k Ul�ntfsir�u�te�'it "_31, <br />ti <br />_ CK MM <br />Alluchnaent - 15 <br />