My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-159
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2024 9:48:46 AM
Creation date
4/15/2024 9:47:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/23/2000
Control Number
2000-159
Entity Name
Brad Smith Associates, Inc.
Subject
Professional Engineering & Architectural Services Agreement for
Jungle Trail & Pelican Island Wildlife Refuge Enhancement Project
Project Number
IRC-9724
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />4D <br />40' <br />C. Site visits other than those defined in SCOPE/SERVICES, for the purpose of <br />approving the Contractor's requests for payment. <br />D. Specific additional services that are anticipated as possible /inure needs ttre as <br />follows: <br />1) Engineering services for design and permitting of the master planned <br />wastewater lift station and force main shall he negotiated between CAI and <br />IRCDUS as a separate contract, but will be attached as an addendum to Brad <br />Smith and Associates, Inc.'s contract with the County for (lie work described <br />herein. <br />2) The County may require master planning and land management services for <br />the Jungle Trail corridor. If such services are desired, the cost shall be <br />negotiated as an additional service. <br />3) Grant writing services will be negotiated as an additional service. <br />E. Irrigation Design services. <br />F. Archeological consulting; services. <br />G. Wetland permitting; and/or mitigation services. <br />H. Modifications to proposed loop road alignment after approval. <br />I. Profiles for the proposed loop road. <br />J. Design and permitting for the U.S. Fish & Wildlife: Service's S.R. AIA Connector <br />road. <br />K. Bidding and Construction Phase services by Carter Associates, Inc. <br />L. Certifications to pennitting agencies. <br />M. "As -built" surveys. <br />N. Any additional survey work beyond that described under "Task 1. <br />Initial her (Landscape Architect) (County) <br />MMMMMMM <br />'11WMEM <br />�t;;k Ul�ntfsir�u�te�'it "_31, <br />ti <br />_ CK MM <br />Alluchnaent - 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.