Laserfiche WebLink
40 <br />DATE: 03/30/00 <br />FILE: 10.2 <br />TYPE: III <br />CLASS: III <br />FLORIDA EAST COAST RAILWAY NO. OF DAYS, 14 <br />OFFICE OF THE CHIEF ENGINEER AAR / DOT #: 272159U <br />OF SIGNALS AND CCHMUNICATION MILE POST: 212 + 2291' <br />Project Type: FDOT <br />ESTIMATED COST FOR HIGHWAY CROSSING WARNING DEVICES AT CR 505 (ROSELAND ROAD). <br />This estimate should be considered void after one (1) year, <br />MATERIAL UNIT COST UNITS TOTAL COST <br />GATE ASSEMBLIES $4,997.00 4 EA. $19,968.00 <br />GATES $500.00 4 EA. $2,000.00 <br />GATE FOUNDATIONS $575.00 4 EA. $2,300.00 <br />WIRED CASE, 3A13 & PMD -3R $38,670.00 1 EA. $38,670.00 <br />BATTERY BOK $675.00 1 EA. $675.00 <br />MISC. GROUND MATERIAL $789.62 1 PKG. $789.62 <br />CONDUIT & DIRECTIONAL BORE $45.00 70 FT. $3,150.00 <br />BATTERIES $200.00 30 EA. $6,000.00 <br />CABLE $7,500.00 1 PKG. $7,500.00 <br />MISCELLAANEOUS RELAY EQUIP $1,120.00 1 PKG. $1,120.00 <br />POWER SERVICE $900.00 1 EA. $900.00 <br />MONITORING EQUIPMENT $5,422.60 1 PKG. $5,422.00 <br />SANITATION & DISPOSAL $1,500.00 1 PKG. $1,500.00 <br />FREIGHT & HANDLING $13,277.00 <br />TAX @ 6.58 $5.753.00 <br />TOTAL MATERIAL'S $105,044.62 <br />EXCAVATING EQUIPMENT PER DAY $181.00 14 DAYS $2,534.00 <br />EQUIPMENT RENTAL PER DAY $125.00 14 DAYS $1,750.00 <br />FOREMAN'S TRUCK PER DAY $35.00 14 DAYS $490.00 <br />GANG TRUCK PER DAY $63.00 14 DAYS $882.00 <br />SUPERVISORS TRUCK PER DAY $35.00 14 DAYSQwy,'. <br />EQUIPMENT TOTAL $6,146.00 <br />ENGINEERING $4,500.00 1 $4.50D.00 <br />ENGINEERING TOTAL $4,500.00 <br />CONSTRUCTION SUPERVISION $266.00 14 DAYS $3,724.00 <br />LABOR ADDITIVE 52.074.00 <br />SUPERVISION TOTAL $5,798.00 <br />LABOR PER DAY $1,035.40 $14,496.00 <br />NUMBER OF DAYS 14 <br />LABOR ADDITIVE $8.4G0.00 <br />TOTAL LABOR $22,956.00 <br />GANG EXPENSES PER DAY $553.00 <br />NUMBER OF DAYS 14 <br />TOTAL GANG EXPENSES $7,742.00 <br />SUB -TOTAL $356,1$6.62 <br />CONTINGENCIES 5% $7,809.00 <br />TOTAL $164,00D.00 <br />ri7159U.r.ls <br />