My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-160
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2024 10:06:08 AM
Creation date
4/15/2024 10:05:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/23/2000
Control Number
2000-160
Entity Name
Florida East Coast Railway Company
Subject
License Agreement for Upgrade Ralroad Crossing at Roseland Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />40 <br />i. The RAILWAY shail add an 8' wide asphalt sidewalk on the south side of the cxisting <br />24' wide Type T -modified grade crossing surface (the "SURFACE') along with other <br />improvements as shown on the drawing, attached hereto as part of Exhibit A, in accordance with <br />Florida Department of Transportation Standard Specifications for Road and Bridge Construction, <br />Index No. 560, as may be amended, at the sole cost of COUNTY. Installation costs are <br />estimated to be $1,800.00 as shown on the estimates for crossing installation attached hereto as <br />Exhibit B and incorporated by reference. When the RAILWAY determines that the replacement <br />of the new SURFACE is more economical than its continued maintenance, the RAILWAY shall <br />have the exclusive option to replace the SURFACE with a comparable or improved structure. <br />The replacement costs of the new SURFACE shall be the sole responsibility of the COUNTY. <br />The COUNTY shall, at its sole expense, maintain and replace the remainder of the road inside <br />the RAILWAY'S right -of --way, plus any paving which may be located between the ends of the <br />ties. The RAILWAY shall provide a construction watchman at said CROSSING SITE while <br />work is being performed by the COUNTY under the provisions of this Agreement, at the sole <br />expense of the COUNTY. <br />8. The COUNTY agrees, acknowledges and understands that the RAILWAY reserves <br />the right to make any changes at any future time in its existing tracks or other facilities, including <br />the installation, maintenance and operation of any additional track or tracks or other facilities on <br />its right-of-way at the CROSSING SITE. The COUNTY agrees to bear the total expense of any <br />changes or additions to the pavement and traffic signal devices, the SURFACE, the WARNING <br />DEVICES or other railroad signalication equipment or new structure at the CROSSING SITE, <br />whether these changes or additions are required by law or order of any public or judicial <br />authority, done voluntarily by the RAILWAY, or requested by the COUNTY. <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.