My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-168
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2024 11:20:21 AM
Creation date
4/15/2024 11:14:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/06/2000
Control Number
2000-168
Entity Name
The Suntree Partners, LTD
Subject
Agreement for Construction of Improvments to 5th Street S.W.
Citrus Springs
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O <br />C"> <br />4� <br />3. Sth Street S.W. Reimbursement By County. <br />A. The Developer and the County shall each be responsible for and shall pay My <br />percent (5011/o) ofthe cost of surveying, engineering, designing, permitting, constructing, inspecting, <br />and related costs ("Construction Costs") for 5th Street S.W. from 58th Avenue east to the point <br />where the Developer has frontage on both sides of the road, or approximately 2,550 feet. The <br />Developer shall pay and be responsible for twenty -Five percent (25%) of Construction Costs from <br />that point to the eastern boundary of the Developer's project on the north side of 5th Street S.W. or <br />approximately 400 additional feet and the County shall be responsible for seventy-five percent(75%) <br />of such Costs. <br />B. The County shall reimburse the Developer for Construction Costs for <br />construction of 5th Street S.W. to 43rd Avenue, as follows: <br />i. For that portion of 5th Street S.W. where the Developer has frontage, <br />reimbursement by the County shall be made within thirty (30) days of the County's inspection and <br />approval of the work. <br />ii. The County has entered into a Developer's Agreement with the Arbor <br />Trace Development, Inc. ("Arbor Trace'), to receive payment from Arbor Trace for the cost of <br />construction of 5th Street S.W. between 43rd Avenue and the western limits of the Arbor Trace <br />Development; therefore, the County will reimburse the Developer immediately upon payment by <br />Arbor Trace to the County pursuant to that Agreement, or within two years of completion of the <br />road, whichever comes first. <br />iii. The County may reimburse the Developer for all of the remainder of <br />the Construction Costs by levying a special assessment against the benefitting properties, which <br />properties may include Arbor Trace. In any event, the Developer shall be fully reimbursed by the <br />County, except for Developer's share described in Paragraph 3.A.. above, within two years of the <br />completion of construction of the road by the Developer. <br />4. Kings Highway Improvements. County will complete its improvements to 58th <br />Avenue (Kings Highway) between 16th Street and Oslo Road. In conjunction with said <br />improvements, County will construct a left turn lane at 5th Street S.W. <br />5. 5th Street S.W. Bridge. Developer shall design and construct a three lane bridge <br />similar to the bridge at 16th Street and Lateral B Canal for vehicular and pedestrian traffic on 5th <br />Street S.W. across the Lateral B Canal to 58th Avenue in accordance with design drawings and <br />specifications approved by the County, which approval shall not be unreasonably withheld. The <br />County must approve all engineering and related costs prior to any work being authorized. <br />6. Bridge Reimbursement by County. The Developer shall contribute $200,000.00 <br />toward the engineering, design, permitting, utility relocation, and construction costs of the bridge, <br />in exchange for traffic impact fee credits for the same amount. The County shall approve :411 <br />engineering contracts, design, pennit applications, and construction documents priorto construction <br />or initiation of any work to be performed. The County shall reimburse the Developer for all <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.