O <br />C"> <br />4� <br />3. Sth Street S.W. Reimbursement By County. <br />A. The Developer and the County shall each be responsible for and shall pay My <br />percent (5011/o) ofthe cost of surveying, engineering, designing, permitting, constructing, inspecting, <br />and related costs ("Construction Costs") for 5th Street S.W. from 58th Avenue east to the point <br />where the Developer has frontage on both sides of the road, or approximately 2,550 feet. The <br />Developer shall pay and be responsible for twenty -Five percent (25%) of Construction Costs from <br />that point to the eastern boundary of the Developer's project on the north side of 5th Street S.W. or <br />approximately 400 additional feet and the County shall be responsible for seventy-five percent(75%) <br />of such Costs. <br />B. The County shall reimburse the Developer for Construction Costs for <br />construction of 5th Street S.W. to 43rd Avenue, as follows: <br />i. For that portion of 5th Street S.W. where the Developer has frontage, <br />reimbursement by the County shall be made within thirty (30) days of the County's inspection and <br />approval of the work. <br />ii. The County has entered into a Developer's Agreement with the Arbor <br />Trace Development, Inc. ("Arbor Trace'), to receive payment from Arbor Trace for the cost of <br />construction of 5th Street S.W. between 43rd Avenue and the western limits of the Arbor Trace <br />Development; therefore, the County will reimburse the Developer immediately upon payment by <br />Arbor Trace to the County pursuant to that Agreement, or within two years of completion of the <br />road, whichever comes first. <br />iii. The County may reimburse the Developer for all of the remainder of <br />the Construction Costs by levying a special assessment against the benefitting properties, which <br />properties may include Arbor Trace. In any event, the Developer shall be fully reimbursed by the <br />County, except for Developer's share described in Paragraph 3.A.. above, within two years of the <br />completion of construction of the road by the Developer. <br />4. Kings Highway Improvements. County will complete its improvements to 58th <br />Avenue (Kings Highway) between 16th Street and Oslo Road. In conjunction with said <br />improvements, County will construct a left turn lane at 5th Street S.W. <br />5. 5th Street S.W. Bridge. Developer shall design and construct a three lane bridge <br />similar to the bridge at 16th Street and Lateral B Canal for vehicular and pedestrian traffic on 5th <br />Street S.W. across the Lateral B Canal to 58th Avenue in accordance with design drawings and <br />specifications approved by the County, which approval shall not be unreasonably withheld. The <br />County must approve all engineering and related costs prior to any work being authorized. <br />6. Bridge Reimbursement by County. The Developer shall contribute $200,000.00 <br />toward the engineering, design, permitting, utility relocation, and construction costs of the bridge, <br />in exchange for traffic impact fee credits for the same amount. The County shall approve :411 <br />engineering contracts, design, pennit applications, and construction documents priorto construction <br />or initiation of any work to be performed. The County shall reimburse the Developer for all <br />-2- <br />