My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-060
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2024 3:13:02 PM
Creation date
4/18/2024 3:08:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/19/2024
Control Number
2024-060
Agenda Item Number
8.B.
Entity Name
De La Hoz Builders
Subject
Section 00520 Agreement for New Restroom Facility at Fran B. Adams North County Regional Park
Bid Number
2024031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) and De La Hoz Builders, Inc. (hereinafter called CONTRACTOR). OWNER and <br />CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The proposed project includes installation of a new restroom building to serve the <br />playground area north of the existing softball complex, as well as associated utility <br />and parking improvements <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: NEW RESTROOM FACILITY AT FRAN B. ADAMS NORTH COUNTY <br />REGIONAL PARK <br />FM Number: N/A <br />Bid Number: 2024031 <br />Project Address: 9450 County Road 512 Sebastian, FL 32958 <br />ARTICLE 3 - ENGINEER <br />3.01 OWNER's Consultant, Masteller & Moler, Inc., is hereinafter called the ENGINEER and will <br />act as OWNER's representative, assume all duties and responsibilities, and have the rights <br />and authority assigned to ENGINEER in the Contract Documents in connection with the <br />completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 240th calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph 14.07 <br />of the General Conditions on or before the 270th calendar day after the date when the <br />Contract Times commence to run. <br />4.03 Liquidated Damages <br />Agreement (Public Works) REV 04-07 - 00520 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.