Laserfiche WebLink
40 <br />4D <br />INDIAN RIVER COUNTY, 'FLORIDA <br />CHANGE ORDER NO. 5 <br />KINGS HIGHWAY CHASE I <br />Project No: 8823 <br />Location: 58th Avenue/12th Street to 26th Street <br />Contractor: Dickerson Florida, Inc. <br />P.O, Drawer 719 <br />Stuart, Florida 34995 <br />Date of Issuance: <br />ITEM DESCRIPTION OF CHANGE QUANT. UNIT UNIT PRICE PRICE <br />NO, PRICE INCREASE DECREASE <br />A. Bridge <br />1 <br />Review of Main Canal Deck Unit & <br />78.5 <br />HRS <br />($90.00) <br />{$7,065.00 <br />Sheet Pile Redesign <br />2 <br />Barrier Wall Steel Relocation Review <br />6 <br />HRS <br />($90:00 <br />($540.00 <br />3 <br />Review of Wing Wall Revisions <br />4 <br />HRS <br />($90,00 <br />{$360.00 <br />4 <br />Review Penetrant Sealers <br />11 <br />HRS <br />($90.00 <br />($990.00 <br />5 <br />Review of Out of Tolerance Piles <br />6 <br />HRS <br />($90.00 <br />($540.00 <br />6 <br />Review of 3rd Submittals <br />12 <br />HRS <br />(swooj <br />($1,080.00 <br />7 <br />Repair median separator <br />1 <br />LS <br />$1,353J00 <br />$1,35100 <br />8 <br />Install 4 scuppers Main Canal Bridge <br />1 <br />LS <br />$3,300.00 <br />$3,300.00 <br />9 <br />Eliminate camber between deck units <br />1 <br />LS <br />$2,310.00 <br />$2,310.00 <br />on Main Canal Bridge sidewalk <br />10 <br />Special Guardrail Posts <br />13 <br />EA <br />$120.00 <br />$1,560.00 <br />11 <br />Delete non-skid on Mn Canal Brdg Sdw <br />1 <br />LS <br />($1,000.00 <br />($1,000.00] <br />B. Roadway <br />1 <br />Guardrail 'End Anchorage <br />a. Add ET -200 <br />1 <br />EA <br />$2,811.16 <br />$2,811.16 <br />b. Delete Type IV <br />-3 <br />EA <br />$620.00 <br />($1,860.00; <br />c. Add MELT <br />3 <br />EA <br />$1,210.00 <br />$3„630.00 <br />2 <br />Delete Gravity Retaining Wall(C.O. #3) <br />-209 <br />LF <br />$126.45 <br />($26,428.05; <br />3 <br />Varible Message Sign <br />8 <br />ED <br />$38.00 <br />$304,00 <br />4 <br />Type S Asphalt <br />1032.19 <br />TON <br />$37.50 <br />$38,707-131 <br />5 <br />Pipe handrail, Main Canal'. Bridge <br />40 <br />LF <br />$10.20 <br />$408.00 <br />7 <br />Revise stabalized subgrade <br />27705 <br />SY <br />$0.52 <br />$14,406.60 <br />quantity (C.O. #2) <br />8 <br />Delete Rip Rap Rubble <br />-2332 <br />Thi <br />$32.50 <br />($75,790.00: <br />9 <br />Removal and replacement of sidewalk <br />1 <br />LS <br />$29,781.10 <br />$29,781.10 <br />and curb at County's direction <br />10 <br />Temporary Pavement <br />-332 <br />SY <br />$10.65 <br />($3,535.80' <br />11 <br />Concrete Barrier, Temporary <br />1343 <br />LF <br />$12.50 <br />$16,787.50 <br />12 <br />Barricade'remp. Type II <br />121744 <br />ED <br />$0.33 <br />$40,175.52 <br />13 <br />Barricade Temp. Type til <br />-37743 <br />ED <br />$0.50 <br />($18,871,51) <br />14 <br />Subsoil Excavation <br />-2039 <br />Cy <br />$2.30 <br />($4.689.70 <br />15 <br />Geogrid <br />-2531.6 <br />SY <br />$2.75 <br />($6,961.79 <br />16 <br />Turnout construction asphatt <br />249.61 <br />SY <br />$10.70 <br />$2,670.83 <br />Cage 1 of 6 <br />