Laserfiche WebLink
INDIAN RIVER COUNTY, FLORIDA <br />CHANGE ORDER NO. 5 <br />KINGS HIGHWAY PHASE I <br />ITEM <br />NO, <br />DESCRIPTION OF CHANGE 66ANT. I UNITS` UNIT <br />s ! PRICE <br />PRICE. <br />INCREASE <br />PR(CE <br />DECREASE <br />28 <br />Loop Amp, Type "6" <br />101 <br />EA ! <br />$133-001 <br />$1,330.001 <br />29 <br />Raise Controller Pad and 5 pull boxes <br />1 <br />EA <br />$1,928.93 <br />$1,928.93 <br />D. Utilities <br />1 <br />20" DIP WM (C.O. #3, B.7) <br />-38 <br />LF <br />54.00 <br />($152.00 <br />2 <br />Hydrant Relocation (C.O. #3, B.10) <br />-1 <br />EA <br />$600.00 <br />{$600.00} <br />4 <br />6" DIP Fittings <br />-0-03 <br />TN <br />$6,000.00 <br />($180.00) <br />5 <br />6" Steel Pipe Fittings <br />J -0.3 <br />TN <br />$2,000.90 M <br />($600.001 <br />6 <br />61" DIP FM Underground <br />-112 <br />LF <br />$20.00 i <br />($2,240.001 <br />7 <br />6" 'Steel Pipe <br />-45 <br />LF <br />$50.00 <br />($2,250.001 <br />8 <br />6" x 10" Tapping Sleeve <br />-1 <br />EA <br />$3,000.00 <br />($3,000.00) <br />9 <br />8" DIP WM Fittings <br />-0.067 <br />TN <br />$2,000.00 <br />($134.00] <br />10 <br />20" x 20" Tee <br />-1 <br />EA <br />$5,600.00 <br />($5,600.00 <br />11 <br />8" DIP WM Above Ground <br />9 P <br />LF <br />$90.00 <br />$810.00 <br />12 <br />8" DIP WM Underground <br />15 <br />LF <br />$30.00 <br />$450.00 <br />P <br />13 <br />20" DIP WM Underground <br />28 <br />LF <br />$158,00 <br />$4,424.00 <br />14 <br />Water Valve Adj. <br />-4 <br />EA <br />$150,00 <br />($600.00)1 <br />15 <br />Relocate Water Meter <br />-1 <br />EA <br />$900.00 <br />($900.00 <br />E. Drainage <br />{ <br />1 <br />P-5 < 10 <br />-3 <br />EA <br />$1,800.00 <br />{$5,400.00 <br />2 <br />P'-5 >10 <br />1 <br />EA <br />$2,100.00 <br />$2,100,00 <br />3 <br />P-6 t 10 <br />1 <br />EA <br />$1,700.00 <br />$1.700.00 <br />j <br />4 <br />J-5< 10 <br />1 <br />EA <br />$2,800.00 <br />$2,800.00 <br />I <br />5 <br />J-6 > 10 <br />-1 <br />EA <br />$3,200.00 <br />($3.200.00 <br />6 <br />Type "'C" <br />-3 <br />EA <br />$800.00 <br />($2,400.00 <br />7 <br />P-7 X10 <br />-1 <br />EA <br />$1,500.00 <br />($1,500.00 <br />8 <br />J-7 = 10 <br />1 <br />EA <br />$2,500.00 <br />$2,500.00 <br />9 <br />J-7 > 10 <br />-1 <br />EA <br />$4,000.00 <br />($4.000.00 <br />10 <br />S -77C, Replace 15" RCP with 10" DIP <br />1 <br />LS <br />$220.00 <br />$220.00 <br />11 <br />S-86 Modifications (C.O. 43, A.10) <br />1 <br />LS <br />$490.00 <br />$490.00 <br />12 <br />S-88 Modifications (C.O. #3, A,22) <br />1 <br />LS <br />$660.00 <br />$660.00 <br />13 <br />S-83, Hand Pour P-1 Inlet Top <br />1 <br />EA <br />$2,365.00 <br />$2,365.00 <br />14 <br />S-82 C, S-92, S-103 Material Cast <br />1 <br />LS <br />$1,789.28 <br />$1,789.28 <br />for Eliminated Structures <br />15 <br />S-99, Sawcut <br />1 <br />EA <br />$302.60 <br />$302,50 <br />16 <br />STA 291+05, Sawcut Weep Holes <br />1 <br />LS <br />$792.00 <br />$792.00 <br />17 <br />STA 299+90, C Inlet & 14' of 15" CMP <br />1 <br />LS <br />$1,364.00 <br />$1,364.00 <br />18 <br />Reduce depth of pond "G" and length <br />-2100 <br />CY <br />$3.80 <br />($7,980.00 <br />of pond °H" <br />19 <br />Add 120LF 46" CAP (C.O. #2) - 82LF <br />38 <br />LF <br />$56.00 <br />$2,128.00 <br />20 <br />Delete 10OLF 48" RCP (C.O. #2) + 2LF <br />-98 <br />LF <br />$60.00 <br />($5.880.00 <br />21 <br />Seed & Mulch College Pond <br />-581.77 <br />SY <br />$0.20 <br />($116.35 <br />22 <br />Sod ditch at College Pond Site <br />737.27 <br />Sy <br />$1.10 <br />$811:00 <br />23 <br />15" RCP Storm Sower <br />16 <br />LF <br />$28.00 <br />$448.00 <br />Pepe 3 oll 6 <br />