My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-200
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2024 11:43:03 AM
Creation date
4/22/2024 11:42:34 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
do <br />40 <br />40 <br />Cl <br />of $11.25 per foot of property fronLtgc of the proposed development. The DEVELOPER's fee for this <br />portion is tabulated below: <br />5th St., SW 5th St., SW Total Frontage Cost per Front Developer Cost <br />th side Fromagc South side Frontageline-it Feet_ Footage (Ts/ ft.) Rounded)_ <br />nA^I - '')sat I 5.453 i $11.25 $61,346.25 <br />1.b. FORCE MAIN EXTENSIONILOOP -- 6 -inch Force Main alon 5'" Street SW: <br />Furnish and install a 6 -inch force main along 5th Street SW from Kings Highway (5e Ave.) cast to <br />43"' Avenue. Make connection to a future 6 -inch force main to be located on 43` Avenue. The <br />proposed 6 -inch force main for this DEVELOPMENT shall extend approximately 5,453 +f- lineal feet <br />to 43"' Ave. The DEVELOPER shall make connection to a proposed 6 -inch force main to be <br />constructed along 43m Ave. by another Developer known as Arbor Trace. <br />The DEVELOPER shall construct a 6 -inch diameter force main along 5''' Street SW, <br />approximately 5,453 feet in length, connecting to a future 6 -inch force along 43rd Avenue and <br />connecting to an existing 6 -inch force main on the ~vest side of Icings I'lighrvay (58th Avenue). <br />The COUNTY shall reimburse the DEVELOPER based on an itemized invoice of installed <br />materials on a percentage complete. basis (less 10% retainage) monthly, wilt final payment and release <br />of retainage at the time the above referenced facilities are dedicated to and accepted by the COUNTY. <br />Reimbursement shall be in the form of check from the COUNTY, and shall not exceed the amount <br />of jjgS,506 (see attached Exhibit C-1). The Developer shall pay line extension fees in the amount of <br />$11.25 per foot of property frontage of the proposed development. The DEVELOPER'S Fee for this <br />portion is tabulated below: <br />1.c. SPECIAL CONSTRUCTI N PROVISION /CONDITION <br />The Developer is relying upon the construction of a server force main along 43"' Ave. Street to be <br />installed by others (Arbor Trace Development, On -Site Management as the Developer). Arbor Trace <br />is currently under construction may not run concurrently with Citrus Springs Development. TherefOre <br />it is agreed that the DEVELOPER install a 6 -inch sewer force main if the 6 -inch force main is clot <br />installed along 43'd Avc• tinder an Arbor Trace Developer's Agreement or its sequel. If die force main <br />along 43''' has not been constructed by Arbor Trace Development, the DEVELOPER shall furnish and <br />install a 6 -inch force main along 43"' Ave. from 51" street SW to Oslo Road. The proposed force main <br />shall extend along 43'4 Avenue to the intersection of Oslo Road for a total of approximately 4,000 +! <br />lineal feet. <br />SC -2. Amendment: <br />'finis agreement may be modified only by a written instrument executed by all parties to the agrccmcnt. <br />SC - 3. Assignability: <br />Either party may assign this Agreement, however, the rights granted herein shall run with the land and <br />are not considered the personal property of the DEVELOPER. Therefore, while the DEVELOPER has the <br />1'+ge 2 0 6 <br />r'lW" VnLF -9N RNif:RINQ f ". L14WCc Wm — PWO, CSprrp rw� Spnnp • I.vrab{n Ajit n— Ill" i lux % S+RV'L+ <br />lk �'eloper'S Agretts�c++t <br />C rtm% Cptinp <br />
The URL can be used to link to this page
Your browser does not support the video tag.