CJ <br />i <br />C�l <br />Subsurface Facilities <br />Task 1.0 Kickoff\Schedule Determination Meeting <br />A meeting shall be held prior to the mobilization of the contractor to any of the well sites <br />with the Indian River County Utilities Department, Engineer, and the Contractor at the <br />WTP administration building. The purpose of the meeting is to discuss the proposed scope <br />of work, coordination contacts, site constraints, procedural requirements of the County <br />project work schedule determination, and progress review schedule. The assignment of <br />and responsibilities for the various tasks shall also be discussed. <br />Task 2.0 Sample Collection <br />Water samples from each of the six wells shall be collected by the Contractor at least five <br />days prior to the pump efficiency test. This water quality data will be combined with water <br />quality reports supplied by the County, and be used to formulate the proper chemical <br />blend needed to eliminate the risk of formation plugging, casing damage, and chemical <br />interactions. <br />Data obtained from the sampling and the proposed chemical treatment shall be provided <br />to the County and the Engineer at least five working days before treatment is conducted. <br />Task 3.0 Mobilization and Demobilization <br />All equipment, materials, and labor required to conduct the work shall be provided by the <br />Contractor. Included under this task is mobilization of labor, materials, and equipment <br />to the well site, all setups, site preparation, moving, rigging up, maintaining, and <br />demobilization including rigging down, cleaning, and restoring the site to its previous <br />condition. <br />Task 4.0 Access Port Construction <br />The Contractor shall construct an access port in base of the pump motor at well nos. 1, <br />2, 3, and 4 for the purpose of inserting a water level indicator between the pump <br />column/casing annulus so that specific capacity tests may be performed. The ports of all <br />six wells will be tapped so that a threaded plug may be used to seal the wells. The <br />threaded plug shall be provided by the Contractor. The diameter of the access port shall <br />be sized so that a pressure transducer and 4-20 mA cable can be installed on a permanent. <br />basis on all six wells. <br />Task 5.0 Baseline Well Efficiency Test <br />To establish existing performance conditions, a pump efficiency test shall be conducted <br />before the pump is removed at cacti well. This test is performed to determine pump curve <br />correlation and specific capacity. The contractor shall gather test data including flow rate, <br />pressure, sediment content, static water level, pumping water level, volts, amps, ohms, <br />kilowatts, and vibration level. Information shall be gathered at three separate <br />performance rates. Each well is equipped with a flow teeter. Flow will be directed from <br />the discharge pipe to the ground area surrounding the wells. The existing flow teeters <br />shall be calibrated by either measuring the time it takes to fill a container of known <br />volume or measuring the resistance to flow through an orifice plate. <br />,b] 02 <br />