Laserfiche WebLink
Standard Farm of Architect's Services:. <br />Design and Contract Administration <br />AIA Document B141 -1997 <br />1997 Edition - Electronic Format <br />'this do nimt has important Iepl Lunsixluplea'+. Cmsuittlliun %tiidi an ununILV is rrtwtuI&L l With rcg3 M in ilx WHIP lion ur IlMliliwtiun. At."rlf"; I'ICATION OF <br />THIS ELECTRONICALLY t)R.AF11s13 AlA I)OC'UMENT MAY 1ni ti1.ADF IAY 1'SIN; Ale? l)OC11NlFNf D401.' <br />Cor}Tigltt 1917, 1926, 1948. 1951, 1953, 19519. 1941, 1563, 1966, 1967. 1970, 1973, 1977, 1397, 11997 h}° Iho.lruLTiuul ln%0kFteorA dii Ws. Rgtrodudion ofdta <br />111st4ial her rin or sub>s1=1W quotaliL>,r isf its provisions rvidwnS ++'ritlLxr p Trrrissiraa of the Al.'+ viobta the �w}Tight laws ol'rhe l'nikxl Slatc ;md %%ill subixt the violator to <br />Iepi pros"lim. <br />TABLE OF ARTICLES <br />2.1 PROJECT ADMINISTRATION SERVICES <br />2,2 SUPPORTING SERVICES <br />2.3 EVALUATION AND PLANNING SERVICES <br />2A DESIGN SERVICES <br />2.5 CONSTRUCTION PROCUREMENT SERVICES <br />2.6 CONTRACT ADMINISTRATION SERVICES <br />2.7 FACILITY OPERATION SERVICES <br />2.8 SCHEDULE OF SERVICES <br />2.9 MODIFICATIONS <br />ARTICLE 2.1 PROJECT ADMINISTRATION SERVICES <br />2,1.1 The Architect shall manage the Architect's ;cn,ices and administer lire Project, The Architect shall consull with the <br />Owner, research applicable design criteria, attend Project meetings, comnnulicatc with 9rlEmbers of tll0 i�i4tL'Et•tSilnl 0111Cr5 15 <br />rp opriate and issue progress reports to the Owner. The Architect shall coordinate the services provided by the Architcct used <br />The Architect's consultants with those scn•ices provided by the Chvncr and the CA1,ner's consuhantsrf igly. <br />2,1.2 When Project reclnirclnenis hare been suffscietitly idenlilied, the Architoct shall prepare- :and periodically update for <br />thG Qwner's approval, a Project schedule that shall idcti fy milestone ch tes for rlccisions required of the Owner. design sen•ices <br />furnished by the Architect completion of documentation provided by the Architect. commencement of conslnrclion and <br />,Substantial Completion of the Work. <br />2.1,3 The Architect shall consider and diSL11s5 14'ltll the CAvne_r, the vahic of allernative materials, building m.slcros and <br />equipment, logedier with other considerations bused on program, budget and acstlieliss in developing the design for the Project. <br />AIA l)i)C[J-%WNT i141•8I'ANDARD lOR%l SERVICES - 199711)I IION - AIA-COPYRItIII 1 1997 71W AMERICAN INS -11-11 I II: OF ARC IIL-1 ECTS. 1735 <br />N1,W YORK AVI NVE N.W. WASINNC)IOS., 1). C, 20006-5292, WARNING. t'nlir NW 1111AMr4rYin9vrolat0 1".b LWJiphlld+va"dill sul'iatrll,, violdt1wtepi <br />pr u ierl.'Mis dorum�srl W. v11A1mM%l1y r1-du+wt %with pmnigmm urfiw AIA u d L� W, u1mK o"wieltour %wIntinn 191101 Iho rink i.+f vV irati1s+ a. WAI 1xq <br />l lectronic Formal 13141-1997 <br />