My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-222
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2024 9:45:46 AM
Creation date
4/25/2024 9:37:45 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/18/2000
Control Number
2000-222
Agenda Item Number
11.C.2.
Entity Name
Don Howell Gilmore Associates, Inc.
Subject
Agreement for Main Library Addition & Rremodeling
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4W <br />i <br />40 <br />IRC MAIN LIBRARY EXPANSION t7OW+HOWELL•OILMORE•ASSOCIATES <br />Vero Beach, Florida Architects•Intertors*Planners <br />EXHIBIT TWO <br />CONDITIONS o -PROPOSAL <br />5 June Oli <br />1. Surveying, geotechnical, test & balance and traffic services are to be provided by the <br />Owner, as required, <br />2. It is assumed that the existing water and sanitary sewer service will be adequate to serve <br />the new addition. significant modifications to the existing system required by review <br />agencies is not included in the project scope. <br />3. The proposed extent of this project will probably require that a modification to the existing <br />St. John's Diver Water Management District permit be applied for and approved. This <br />proposal assumes the existing stormwater management system will be maintained. <br />Significant modifications to the existing system required by review agencies is not included <br />in the project scope. <br />4. it Is assumed that eitherthe owner orGorunty Building & Planning Departments can provide <br />record documents andforreports regarding existing approvals for stormwater management. <br />fire, protection, fire alarm, etc. <br />5. Telecommunication and data systems include an empty raceway and outlet box system <br />only. Cabling, outlet devices, terminations and equipment will be provided by the Owner. <br />6. It is assumed that the number and location of existing fire alarm devices in the existing, <br />unaffected areas are to remain. "ro revise thesedevices is not included in the project scope. <br />7. it is assumed that Construction Administration for the project will consist of a single phase <br />encompassing approximately 8 months. <br />B. All fees and printing for Site Plan Application, permitting and bidding purposes will be paid <br />by the Owner. <br />S. platting services, it required, have not been included within the scope of Work. <br />10. The Ownerwill provide access to the existing Multi -Purpose Room roof structure during the <br />Design Development Phase, which will require the removal of all lay -in tile within the room, <br />to allow proper analysis of the existing structural members. <br />
The URL can be used to link to this page
Your browser does not support the video tag.