My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/19/2024
CBCC
>
Meetings
>
2020's
>
2024
>
03/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2024 11:51:39 AM
Creation date
4/25/2024 9:41:38 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/19/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCHITECTURE <br />PLAN NING <br />COMMUNITY <br />RFP 2024014 <br />Jones' Pier Conservation Area Design & Fabrication of Interpretive Center Exhibits <br />7770 Jungle Trail, Vero Beach, Florida 32963 , <br />DESIGN AND FABRICATION BUDGET <br />Revised 2/28/2024 <br />DESCRIPTION <br />QUANTITY <br />PRICE <br />TOTAL AMOUNT <br />Media Wall Carpentry/Storage <br />1 <br />$60,000.00 <br />$60,000.00 <br />Built -In Cabinet Storage/Seating <br />1 <br />$2,000.00 <br />$2,000.00 <br />Drywall, blocking, painting, patching, <br />installation as required <br />1 <br />$0.00 <br />$0.00 <br />Video wall large screen or smaller screens <br />with video table <br />1 <br />$20,000.00 <br />$20,000.00 <br />Underwater camera and installation <br />1 <br />$0.00 <br />$0.00 <br />Time lapse video, photos <br />1 <br />$7,000.00 <br />$7,000.00 <br />Software support for interactive screens <br />1 <br />$15,000.00 <br />$15,000.00 <br />Mary's Corner - interactive projection unit <br />1 <br />$10,000.00 <br />$10,000.00 <br />Chairs and tables at Marys comer <br />1 <br />$3,000.00 <br />$3,000.00 <br />Frames, printed media <br />1 <br />$8,000.00 <br />$8,000.00 <br />Blackout shades <br />1 <br />$5,000.00 <br />$5,000.00 <br />BASE TOTAL <br />$130,000.00 <br />10% Construction Contingency <br />$13,000.00 <br />10% Overhead & Profit <br />$13,000.00 <br />Estimated Construction Total: <br />$156,000.00 <br />Design <br />$54,600.00 <br />Construction Administration <br />$18,200.00 <br />Estimated Budget Total: <br />$228,800.00 <br />Exclusions: Aquarium tank, equipment & <br />fish <br />Exhibition materials: photos, artifacts etc. <br />Site WIFI Services <br />iil: info@rcamyors 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.