My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-079
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2024 10:38:23 AM
Creation date
4/25/2024 10:37:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/09/2024
Control Number
2024-079
Agenda Item Number
8.N.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No. 10 SED to Admin 144 Fiber Expansion Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />RYAN L. BUTLER, CLERK <br />Work Order No. <br />SED TO ADMIN 144 FIBER <br />EXPANSION PROJECT <br />EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately ten (10) months from the Notice to Proceed (NTP). <br />NTP <br />Initial Submittal (40% Design Drawings) <br />Constructability Submittal (80% Design Drawings) <br />Production Submittal (100% Design Drawings) <br />contingent upon BOCC approval <br />6 months following NTP <br />8 months following NTP <br />10 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.