Laserfiche WebLink
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />RYAN L. BUTLER, CLERK <br />Work Order No. <br />SED TO ADMIN 144 FIBER <br />EXPANSION PROJECT <br />EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately ten (10) months from the Notice to Proceed (NTP). <br />NTP <br />Initial Submittal (40% Design Drawings) <br />Constructability Submittal (80% Design Drawings) <br />Production Submittal (100% Design Drawings) <br />contingent upon BOCC approval <br />6 months following NTP <br />8 months following NTP <br />10 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 5 of 5 <br />