Laserfiche WebLink
40 <br />r <br />W <br />Jul -25-40 03:1.0P <br />R.K. ENGINEERING, INC. <br />Consulting Civil Engineering and Land Planning <br />July 25, 2000 <br />Mr. Chris Kafer, P.E, <br />Indian River County <br />1840 25th St. <br />J1A <br />Vero Beach, FL. 32960 <br />N J FeR1NC <br />RE: BERMUDA CLUB <br />1J <br />01 <br />s y <br />Dear Chris:��rli <br />nr <br />The purpose of this letter is to provide you a construction cost estimate for the <br />work remaining for the above referenced project as of this date. This is being <br />Provided to you for the purpose of establishing the amount of the performance <br />trona needed to gat the plat recorded. <br />ITEMS NOT COMPLETE AS OF JULY 25, 2000 <br />1. Phase 4 asphalt paving 1700 If x 20'= 3777 sy @y2.30 = $8,687.00 <br />2• Type C suffer 3700 If @ $1017 per 100 If = $37,629,00 <br />3. Type D Buffer 1400 If (M $588.00 per 100 If = $8,232.00 <br />4. Remedy ADS pipe ends into lakes <br />pump down $2,000.00 <br />Replace end joint + headwall with coated cmp 6 0 $1200 ea $7,200.00 <br />Replace sod $600.00 <br />5. Set PCP's $2.000.00 <br />B. Twoweirs @ $2,000 ea $4.000.00 <br />7. Clean debris from northwest area Phase 4 $2.500.00 <br />S. Final grade lots phase 4 $500.00 <br />9. Clear outfall to river $500.00 <br />Total work remaining $ 73,848.00 <br />Bond amount = 1.15 x $73,848.00 = $84,925.20 <br />The work on Hwy AIA is not completed yet however, there is a performance <br />bond on file with FOOT for more than $100,000 for this work. I assume that the <br />county will accept this as adequate for plat bonding for this portion of the work. <br />Sincerely. <br />Richard J. 'Kam, P.E. <br />R.K. ENGINEERING, INC. <br />Pill <br />47�_ harbor City Blvd., suite, 3 • Melbourne, FL 32935 • Phone: (321) 253.9595 • Fax., (321 ) 253-643 <br />I;:�IIIBIT,;�116� <br />