My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-235
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2024 2:29:36 PM
Creation date
4/26/2024 2:17:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/01/2000
Control Number
2000-235
Agenda Item Number
11.C.
Entity Name
Treasure Coast Contracting
Subject
Contract for Sebastian Water Assessment Project, Phase 2D
Bid No. 2054
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. EXAMINATION OF CONTRACT DOCUMENTS AND SITE <br />4.1 It is the responsibility of each Bidder, before submitting a bid, to (a) <br />examine the Contract Documents thoroughly, (b) visit the site to become <br />familiar with local conditions that may affect cost progress, performance, <br />or furnishing of The work, (c) consider federal, state, and local laws and <br />regulations that may affect costs, progress, performance, or furnishing of <br />the work, (d) study and carefully correlate Bidder's observations with the <br />Contract Documents, and (c) notify Engineer of all conflicts, errors, or <br />discrepancies in the Contract Documents. <br />4.2 Reference is made to the Supplementary Conditions for identification of: <br />4.2.1 Those reports of explorations and tests of subsurface conditions at <br />(lie site which have been utilized by Engineer in preparation of the <br />Contract Documents. Bidder may rely upon the accuracy of the <br />technical data contained in such reports, but not upon non- <br />technical data, interpretations, or opinions contained therein or for <br />tate completeness thereof the purposes of bidding or construction. <br />To obtain access to the site, the following shall be contacted: <br />Michael C. Hotchkiss, P.E., Environmental Engineer <br />Project work site is located within the Sebastian Highlands <br />subdivision road right-of-ways, east of Roseland Road, north of <br />Collier Creek, as shown on the construction plans. <br />4.2.2 Those drawings of physical conditions in relation to existing <br />surface and subsurface conditions (except underground facilities) <br />which are at or contiguous to the site which have been utilized by <br />Engineer in preparation of the Contract Documents. Bidder may <br />rely upon the accuracy of the technical data contained in such <br />drawings, but not upon the completeness thereof for the purposes <br />of bidding or constriction. Copies of such reports anti drawings <br />will be made available by Owner to any Bidder on request. Those <br />reports and drawings are not part of (he Contract Documents, but <br />the technical data contained therein upon which Bidder is entitled <br />to rely as provided in Paragraphs 4.2.1 and 4.2.2 are incorporated <br />therein by reference. Such technical data has been identified and <br />established in the Supplementary Conditions. <br />00100-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.