My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-235
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2024 2:29:36 PM
Creation date
4/26/2024 2:17:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/01/2000
Control Number
2000-235
Agenda Item Number
11.C.
Entity Name
Treasure Coast Contracting
Subject
Contract for Sebastian Water Assessment Project, Phase 2D
Bid No. 2054
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b) Bidder has familiarized itself with the nature and extent of the Contract <br />Documents, lire work, site, localily, and all local conditions and laws and <br />regulations that ill any manner may affect cost, progress, performance or iinislling <br />of the work. <br />(c) Bidder ]las studied care fill ly all reports and drawings of subsurface conditions and <br />drawings of physical conditions which are identified ill Paragraph SC -4.2 of the <br />Sull}1k:Illcnlary Conditions of the extent of lilt technical data contained in such <br />reports and drawings upon which Bidder is entitled to rely. . <br />(d) Bidder leas obtained and carefully studied (or assumes responsibility for obtaining <br />and carefully studying) all such examinations, investigations, explorations, tests, <br />reports and studies (ill addition to or to supplement those referred to ill (c) above) <br />which pertain to the subsurface or physical conditions at or contiguous to the site <br />or otherwise may affect (lie cost, progress, performance or furnishing of the Work- <br />as <br />orkas Bidder considers necessary for the perFormalice or furnishing of the work at the <br />contract price, within the contract time and in accordance will, the other terms and <br />conditions of the contract documents, including specifically the provisions of <br />Paragraph 4.2 of (lie General C'ond'itions; and no additional examination. <br />investigations, explorations, test, reports, studies or sinliilar information or dale or <br />will be required by Bidder I'or such purposes. <br />(c) Bidder has reviewed and checked all information and data sliovvii or indicated oil <br />the Contract Documents wide respect to existing midergroniid facilities at or <br />contiWus3us to the site and assumes responsibility for the accurate localioll of said <br />lrli(IVrgl°olnrd facilitics. No additional cxanlinalions, IIm°rstig.tlioils, exptonartions. <br />Wsls, reports, studies or siltlilar inf01-111ati011 or Lala in resl)cet of said underground <br />I;lcilitics are or will be required by Bidder in order to perform and tinriislt the <br />work at the contract price, v.,ithill the Contract lime acrd in accord Ince with the <br />other terms alld Coalitions of the Conlr:lct Docuntenls. incImiing spCeilically the <br />provisions of Parag-raph 4.3 ol'the Geiicrail Conditions. <br />t[) 13idder has concl:llcd 111e results of all such ulrscrralislns, cx.ullinaliolls. <br />ill vesligastiolls, cxploratilnls, tests, reports and studwi wills the terms and <br />cnnditions of ille Contract I o umcnis. <br />Ig1 Iiidcl�r Ills gi�elr l:n�,:illecl° �tirill�•n It�}lil.•c �}l�:lkl r�lnlh�•t�, t•rrG:l:ti I,r �iisE•rell:lncies <br />(tial it has discovvi-c(I III 1110 CMIIIai l I OCI1111011S .11114 dIC WrillCII I'�tillllltirin <br />111CICol h), Iall kxl Is :I�:crlalalll�• to klddol <br />I WIu-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.