My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-235
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2024 2:29:36 PM
Creation date
4/26/2024 2:17:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/01/2000
Control Number
2000-235
Agenda Item Number
11.C.
Entity Name
Treasure Coast Contracting
Subject
Contract for Sebastian Water Assessment Project, Phase 2D
Bid No. 2054
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />f <br />C7 <br />attended by CONTRACTOR. ENGINEER and others as ap- <br />propriate will be held to establish a working understanding <br />arswrtg the parties as to the Work and to discuss the schedules <br />rtferred to in paragraph 16. procedures for handling Shop <br />Drawings and other submitrils. processing Applications far <br />Payment and mainWning required records. <br />lniriallr AouptaUe Schzduler. <br />? 4. Unl= otherwise provided in the Contact Docu- <br />ments, as toast ten days berorc submission of the first Applica- <br />tion for Payment a conference artendcd by CONTRAMR. <br />ENGINEER "Others as appropriate will be held to rcvku <br />for acrepubility to ENGINEER as provided below the sched- <br />Wes subrrtitud in accordance with pmm raph 2.6. CONTRAC- <br />TOR sitaJl have in additiortaJ test da. % to make correctional and <br />&d,just=nu wad to complete and ntuibmlt the st tedules. No <br />Wvpess payment shall be made to CONTRACTOR until the <br />schedules are submincd to and acccpuNc to ENGINEER as <br />pcovWM below. The progress s.chodulc well be accegnaMe to <br />ENGINEER as providing an ordcsly progsusion of the Wort; <br />to completion within any spccificd Milestones and theConuact <br />Timcs. but such acceptance will neither impose on ENGI- <br />NEER responsibility for the sequencing. Scheduling orprtrgreas <br />of the Worts nor intaferc with or lriicye CONTRACTOR from <br />CONTRA CTOR's full responsibility thcrrfor. CONTRA= R's <br />wbedute of Stoop Di -Awing avid Samplc submissions will be <br />acceptable to ENGINEER as providing a workable arraW. <br />merit for reviewing and processing the required submimU4. <br />CONTRAl:.T10R's schedule of v2Jucs wilt be acceptable to <br />LNG [14EER as to tots and subuaLncc. <br />ARTICLE- 1—CONTRACT 17C?CUMPrFS: INTENT. <br />AMENDING. REUSE <br />lneenu: <br />3.1. The Contract Docuuttcnts comprise the entire apcc. <br />mcnt between OWNER and COAIrRACrOR concerning the <br />Work. The Contact Docurncnts arc complementary: what is <br />celled for by one is as binding as if tailed for by All, The <br />Contract Documents ynll be constnted in aocordancc with the <br />Law of the place of die Project. <br />3-1. It is the intent of the Contract Documents to describe <br />a functionally complete Pro}err for pan tJwmoll to be con- <br />srrucud in arctrrdancc with tisc Contract Documents. Any <br />Work. matcrials or cquipmextt that may re:=nably be inferred <br />from the Contract Documents or from prevailing ,custom or <br />trade usatge ax being required to produce the intended result <br />wll be furnished and perfonmcd whether or not st:xciftcaJly <br />called for. When words or phrases which have a wc14- known <br />see h n ic2l or tnnsuuction industry or trade mnning are used to <br />dcuribe Work. muuiais or equipmcnt. such words Or phrasrt <br />Shall be iatcrpreud in accordutce witft that nscaninr_ Ctarift- <br />cations and interpretations of the Contract D'ocurnctrts shall be <br />issued by ENGINEER as provided in P41rARratph 9.4. <br />3_3. Reference la Sumdard.t wad Speenficanaru of Tedu Leaf <br />Ser enier: Aepordrn,l end ReruaJring D <br />3.3.1. Refcrencc to v=dards. spocihcations. manuals or <br />codes Of any technical society. Organization or assod.atiort. <br />or to the Laws or Reltulations of any goverturrenul authority. <br />whether such reference be specific or by impliew on. "I <br />mr_an Inc latest standard. specif c;sLiOn. rnanual. code or <br />l xws or Reputations in cffca at the ti= of opening of gids <br />tor. on the Effective fate of the Al r=wnt if there were no <br />gids(. except as may be otherwise specifically seared in the <br />Contract Documems. <br />3?, . If. during the perfontsance of the Work., CON- <br />TRACTOR discovers any conRim error. ambiguity or dim - <br />Cie ricy <br />'rs-Cieparicy within the Contr= Decumeatrs or betvveen.the <br />Contract Documents and any provision of any such Taw or <br />Reuutauan apollabic to the performance of the Work or of <br />any such standard, spcdfi iton.•manuaJ or code or of am• <br />instruction of any Supplier rc(crmd to in pxragsaph 6.5. <br />CONTII_V_TOR shall report it to ENGINEER in writing at <br />once. and. CONTRACTOR shalt not proceed with the Wort: <br />affected mereby lesccpt in an emergency as authorized by <br />paragraph 6'3} until in amendment or supplement to the <br />Contract Documents ltas been issued by one of clic methods <br />indicated in paragraph 3.3 or 3.6: provided. however. that <br />CONTRACTOR shall not jx liable to OWNER or ENGI- <br />NEER for failure to report any such conflict. error. ambigu- <br />ity or discrepancy unless CONTRACTOR knew or reason. <br />ably should have known thereof. <br />3.3=. Euecpt as Othcrwisc spccificaliy stated in the <br />Control Documents or as may be provided by amendment <br />or supoirmcnt thereto issued by one of the methods indi- <br />caicd in paragraph 3.5 or 3.6. the provisions of the Coaumct <br />Documents shall take precedence in resolving any conflict. <br />erretr. ambiguity or discrepancy betwccn the provisions of <br />the Contract Documents and: <br />3.3.3.1. the provisions of any such standard. ss ci- <br />frcation. m.nual. code or instruction iwbether or not <br />spccifucal1v incurpotztcd by reference in the Contract <br />[?ccumcntst: or <br />3-3-32. the provisions of any such laws or Metra. <br />tatiors applicable to the perfornunce of the Work <br />(unless such an interpretation of she provisions of the <br />Contract Document$ would result in violatiOn of such <br />!_aw or Rcpulationi. <br />No provision of any such standwd. spccilication. manual. <br />code or instruction shall be eficcrive tochangc the duties and <br />responsibilhics of 0 WNER. CONTRACTOR or ENGINEER. <br />or any of their subcontractors. consultants. &Fcnts. or ern- <br />ptovers from a,osc set forth in she Contract Doc menu. nor <br />shall it be cfrcctiye to assign to owNeR. ENG1NEFR or <br />any or ENG1Nr_ER's Consuttam%. apcnuL or cmPIO?'ces etny <br />duty or auU,ariiy to superviu or direct the furnishing or <br />0070()-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.