My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-235
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2024 2:29:36 PM
Creation date
4/26/2024 2:17:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/01/2000
Control Number
2000-235
Agenda Item Number
11.C.
Entity Name
Treasure Coast Contracting
Subject
Contract for Sebastian Water Assessment Project, Phase 2D
Bid No. 2054
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.7.1.1. *'O1-Eoual ": If in ENGINEER's sett disem. <br />On an it ern of ntaterW or ceivipmcnt proposed by CON- <br />TRACTOR is functionally cquai to that na nA and suffi- <br />ciently similar to that no chasipc in related Work will b,. <br />required. k mar be considered by ENGINEER as an <br />. or -equal.. item. in Wit'sch use r eview and approvsf of the <br />proposed item maw. in ENGINEER's sole disaictitxt, be <br />accomplished without complianee with same or aft of the <br />req uirrancnu for acceptant of proposed substitute it CMS, <br />6.7.1.2. .Sufrrrftute Jrerrts: If in FNGINEER's sale <br />discredon an item of material or equipmcnt proposed by <br />CONTRACTOR docs not qualify as an '"or-craval" item <br />under subparagraph 6.7,1.1, it will be cansidcxrd a pro- <br />posed substhute -nem. CONTRACTOR stroll submit suffi- <br />cient information as provided below to allow ENG INEER <br />to determine ttut the item of material or equipment <br />prtrposed is essentially equivalent to that ranted and an <br />a«ptable substitute therefor. 'lite procedure for review <br />by the ENGINEER will include the following as supple. <br />mentcd in the Gencral Rcquizztncnts and as ENGINEER <br />snay decide is appropriate under the circumstances. Re- <br />quests for review of proposed substitute items of nutcrial <br />or equipment will not be ac=ted by ENGINEER from <br />anyone other than CONTRACTOR_ If CONTRACTOR <br />wishes to furnish or use a substitute item of majetia] or <br />equipment. CO NiRACTOR shall first male written aWi- <br />cation to ENGINEER for acccptanec thereof. certifying <br />that ttsc proposed substitute will perform adcgsntely the <br />fumc-tions and achieve the results colied for by the garcral <br />design. lac sirnilzr in substance to that spcciAc-4 and be <br />suited to the same use as that sm-cifted. The appli <br />
The URL can be used to link to this page
Your browser does not support the video tag.