My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-235
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2024 2:29:36 PM
Creation date
4/26/2024 2:17:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/01/2000
Control Number
2000-235
Agenda Item Number
11.C.
Entity Name
Treasure Coast Contracting
Subject
Contract for Sebastian Water Assessment Project, Phase 2D
Bid No. 2054
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-1 <br />40 <br />tLjponsib liacs shall be the prevention of accidents and the b?S.l.l. aallll held n �� crm iqua quantities, <br />dimen• <br />maintaining and supervising of safety prc=uorts and Pro, mepts.p=elts f� require- <br />ments. mxus�-'els. wog numbet�x utd similar information <br />pa't's• with respect thereto. <br />H=ard Communi adOR PrvXrastrt <br />6-2-1 CONTRACTOR "'be rppon%'We for coordinating <br />any cxd=fc of material safety data sheeu or other hazard <br />communication information required to be made avaitable to of <br />exctturged between or among employers At the site in &0= - <br />dance with Laws or Ret 4lions. <br />EnwTeneia: <br />6.13. In emcrrCr16CS alferxing the safety or pnnccdon of <br />persons or the Wont or pr'open'y a the site or &d M4 <br />thereto. CON'IR,AZMP— withcrttt special itutrtsctiaa I a'+- <br />ttorization from owNER or ENGINEER. is obUFUCrd to <br />act to prevent d,exterWed damage. scanty of foss. CON- <br />TRACTOR shall five ENGINEER ptgtnpt writtrat tt+ 61 if <br />+CONTRA=R believes that any siprsftrattt ctw4cs in the <br />Work or va iations fiwn the C:an F= Doeuneatts have been <br />t thereby, if ENGINEER determines that a chattttc in <br />the Contract 'Documents is required bemuse of she action <br />taken by COMR,NC OR in resWttx W Such In t tncrreriey, <br />a Worst Change Directive orC tangy Ordcr will be issued CO <br />document the Conscquervccs of such acaion- <br />6.3A. Shap ,L)mWin" orad SdMTL : <br />6.24.1. CONTRACTOR shall t� itt S � � to <br />the <br />ENGINEER for review and uPPcD <br />aCCCpued schedule of Shop DrAwintrs and Sample submittals <br />tsec paragraph 2.91. All subm'raals will be idcnt'sftcd as <br />ENGINEER may require and in the number of copies <br />specified in the Genrn Requirerncnm 11w data shown ors <br />the Shop Drawing% will be complete with rear= to quarnd- <br />tics, dimensions. speaifted pereortmnee and design criteria. <br />frateMs ant Similar dim to show ENGINEER theme Ind <br />anal egtaipmew CON17- iCDC7 pro to pro <br />to enable 'ENGINEER to review the Information for the <br />limited purposes required by paragraph 6.!6- <br />6.24a CONTRACTOR shall also submit Samples to <br />ENGINEER for teview And approval in aceordxncc with <br />said accepted schedule of Shoo drawings And Sample suer <br />rninals. Each Sample will be identified clearly &1 %0 rnaserial. <br />Supplier. pertinent data such as catalog numbers and the use <br />for which intended and otherwise as ENGINEER may <br />requsrc to enable ENGINEER to review the submittal for <br />the limited purposes required by parafsaRh 6.2& The nwn- <br />bcrz of each Sample to be suorninod will be as specified in <br />th., Spcciriraanns. <br />625, Subff ami Prucedurrs: <br />6,75.1, llefare subrrr tting rack) shop Drawing or Sam- <br />pte. Cf7N-MAMR shall have determined and vcfihcd: <br />625.1.'_ all mutcriyls with respect to intended use. <br />fabrication. shippinr_ handling. stotaffr-. assembly and <br />instailstian p rmining to the perfornanee of the Work. and <br />6,2j,1w. all information relative to COWRAL—TOR's <br />joie responsibilities in ":3p= of mesas. rncthods, tcets- <br />iques. sequences and procedures of construction and <br />safety precautions and programs incident thereto. <br />CONTRACTOR shall also hive rcvkwed aawi toordimued <br />ezaclt Shop Drawing or sample with other Shop Drawinp <br />and Samples and with the requirMMS of the Work and.the <br />Contract. Documents. <br />fi I ! 'Each submittal will bear a SUMP or spcditc <br />winter situation that COMRACTOR bas satisf cd C[)N- <br />TRACTOR's oblilratituts under the Contact, Documentsof that <br />respect to CONTR,4CTOR'S review seat app <br />submittal. <br />6?4,3. At the time preach, submission. CONTRACIilR. <br />shalt five ENGINEER specific written notice of such van- <br />a6crts. ii Any, that the Shop Drawing or Sample submitted <br />nnv have from the rtquisttrraitx of tlhe Coni -xa Doeu <br />such notice to be in a written COmmunitaliort SCPJS=a from <br />the submittal: and. in addition. shall rousse a specific notation <br />to be made on each Shop Drawing and Sample subtritaed to <br />ENGINEER for ccview and approval of each such variation. <br />6.26. ENGMEER we'll review And appfove Shop Drawin€s <br />and Samples in accordance with the schedutc of Shop Draw- <br />ings and Sample submittals accepted by ENGINEER as re- <br />quired by paragraph 2-9. ENGINEER's review and approval <br />will be only to determine if the items covered by the submituls <br />will, after installation or itrcorpor+ii0n in the Work. conform to <br />circ infotmation given in the Cotntract Documents gad be <br />compatible with the design cnnmPt of the comp Ic tcd Pro)caIs <br />a functioning whole As indicated by the Coturats Da...nmenu• <br />EIIGINEER's review and approval wrli not oto paste eaM <br />menhod4, techniques. scqueru;cs or proaed <br />[except where a ucdon <br />particular means. method. technique. se- <br />qucnce or procedure of construction is specificalty and ex- <br />pressly called for by tie Contra=s Ckicufncfn's' or to safety <br />precautions or programs incident thereto. <br />The review and <br />approval of a sertaratc item as such will not indicate approval of <br />the assembly in which the item functions. CMT p <br />Shalt make Corrections requited by ENGI rsE R, an 'I <br />return the required number of canrctcd cop <br />ie <br />and submit as requirtAi new Samptc-S for review and <br />R shall direct specific attention in <br />approval. CC]Ni�LACIO led for by <br />writing to rrvi.�ionsreother than the cotrcctians Gal <br />ENGINEER on pvious submittals. <br />617. ENGINEER's review and ataPrev*l pf Shop Dra*" <br />ruts or Samples shall nit relieve CONTRAft tram resWn <br />sibility for any vanatlon from the requirements of the Canulx <br />00700-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.