My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/09/2024
CBCC
>
Meetings
>
2020's
>
2024
>
04/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 11:16:32 AM
Creation date
5/16/2024 10:57:47 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/09/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. <br />The Architect will wide constrvcti admini� whiff In (2) <br />constwction nbadrvatlIon_inspections and requests fix infix <br />The ,Ardutect will provide the f+oilDwmg documents: <br />1) Signed and sealed construction documents per building department requirements. <br />2) Electronic copy of specifications. <br />3) Meetings with ownw as needed. <br />4) Meetings with permitting agencies having jurisdiction over *s project as needed. <br />We anticipate the following schedule; <br />Task anon <br />I. Field work, design development 4 weeks <br />II. Complete construction documents 6 weeks <br />III. Bidding, building pwohm.vicem 8 weeks <br />IV. Construction 3 months <br />C. Owner's Responsibility <br />Ile Owner's Responsibilities shall be as folk>wa: <br />L Provide as built construction documents. <br />2. Provide access for field bwoWS ons/measurements. <br />3. All. permit and applicat m fess. <br />D. Additional Services <br />I. Costs to modifycompleted drawings, previously approved by Owww fm nvisons <br />due to scope changes or value engineering. <br />2. Consultation concerning replacements g ep of ate► work damaged by fig Vic'adw cow:: <br />during construction. <br />3. Matdng revisions in drawings, d or otlt documeYtts when . <br />are inconsistent with ikon'p►ily given by the Owl prow 4VW <br />authorized by the Chvnei. <br />4. Preparing as built lraw�e showing significant changes in work 4udx4g,, a on <br />or imme d iatdy after edit a mpletion, <br />5. Providing detailed preliminary cost datapricer to <br />6. Secu* and surveillance systems design, billed at oxo. <br />7. Special eonsaftents ode of arcit''tectural services, billed at cost. <br />In the ev.additional building solutions, expanded scope, or additional research be requested by <br />the Owner, EDB AtehiteM will provide them, for additional cost at the rates per eonti <br />contract.... . <br />136 <br />
The URL can be used to link to this page
Your browser does not support the video tag.