My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/09/2024
CBCC
>
Meetings
>
2020's
>
2024
>
04/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 11:16:32 AM
Creation date
5/16/2024 10:57:47 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/09/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. The Architect wttl-povide construction adminis which � (2) <br />construction ob$Wva.dm inspections and requests for infcs"t'r►ation (RFIr4 <br />JUL DdWerabbs <br />The Architect will provide the following documents: <br />1) Signed and seai©d cc mftuction doffs per building department I i nems. <br />2) Electronic copy of specificafiions. <br />3) Meetings with owner as needed. <br />4) Meetings with permitting agencies having jurisdiction over the pn*a as A <br />We anticipate the following schedule: <br />Task Duration <br />L Field work, design development 4 weeks <br />IL Complete constructs documents 6 weeks <br />III, Bidding, building pwmit review 8 weeks <br />N. Construction : 3 months <br />Q '.s Responsibility <br />TU Owner's Responsr'bilit m be as follows: <br />1.. Provide as buds` construction documents. <br />2, Provide access ftnr field investgations/measurements. <br />3. All permit and application fees. <br />D. <br />1 Costs to modify completed drawings, previously approved by Owner, for revisions <br />due to scope changes or,value engineering. <br />2. Consultation concerning replacements of aW woe damn , by.fix,or other cause <br />during construction. <br />3. Making revisions in, drawings, spetaf 4iot , or other its when such revisions <br />are inconsistent with instruction pmviou* given by the Ovowor any agent <br />authorized by the Owner. <br />4. Preparing as built drawings showing signiificant changes in work.during.construction <br />or immediately air building cl'.. <br />5. Providing detailed preliminary cost data prior to cma union doaxopts. <br />6. Security and surveillance systems design, billed at cost,. <br />7 Special consultants out of architectural services; .billed at coxa. <br />In the event additional building sohrtions, n" sem, or additional march be requested by <br />the Owner, EDB Architects will provide them for additional cost at the rates per continuing <br />contract: <br />142 <br />
The URL can be used to link to this page
Your browser does not support the video tag.