Laserfiche WebLink
Work Order No. <br />SED TO ADMIN 144 FIBER <br />EXPANSION PROJECT <br />EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately ten (10) months from the Notice to Proceed (NTP). <br />1►1H <br />Initial Submittal (40% Design Drawings) <br />Constructability Submittal (80% Design Drawings) <br />Production Submittal (100% Design Drawings) <br />contingent upon BOCC approval <br />6 months following NTP <br />8 months following NTP <br />10 months following NTP <br />N K) <br />174 <br />