My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/09/2024
CBCC
>
Meetings
>
2020's
>
2024
>
04/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 11:16:32 AM
Creation date
5/16/2024 10:57:47 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/09/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
puf <br />INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Board of County Commissioners <br />THROUGH: John A. Titkanich, Jr., County Administrator <br />Sean A. Lieske, Acting Public Works Director <br />Kirstin Leiendecker, P.E., Assistant Public Works Director <br />FROM: Jill Williams, Contract Support Specialist <br />SUBJECT: Utility Work by Highway Contractor Agreement for Water and Sewer Construction on <br />IRC Project 43rd Avenue Bike & Pedestrian Improvements (12th Street to 18th Street) <br />IRC -1818 <br />DATE: March 14, 2024 <br />DESCRIPTION AND CONDITIONS <br />On August 16, 2022, the Board of County Commissioners approved Work Order No. 52 with Kimley-Horn and <br />Associates, Inc. to provide design and permitting services for roadway and pedestrian improvements for 43rd <br />Avenue between 12th Street and 18th Street. Staff had determined that this section of roadway lacked adequate <br />interconnected pedestrian and bicycle facilities. This design will allow for minimum bike lane widths and bike <br />lanes to be signed and marked along 43rd Avenue, which is a major north/south corridor. On October 17th, 2023, <br />the Board entered into an agreement with the Florida Department of Transportation (FDOT) for a grant in the <br />amount of $1,470,610.00 for the construction and construction, engineering, and inspection services for this <br />project. <br />To reduce potential utility relocation conflicts and minimize construction delays to the County project, the <br />City of Vero Beach Water and Sewer Department has prepared construction drawings to modify its <br />facilities in concert with the 43rd Avenue (12th Street to 18th Street) project boundary. The City of Vero <br />Beach City Council authorized a 'Utility Work by Highway Contractor Agreement' on March 13, 2024, to <br />allow the County's selected contractor for this project construct and relocate water and sewer facilities <br />within the project boundary. This Agreement also provides compensation, based upon the Engineer's <br />Probable Cost of Construction Estimate, prepared by the City, in the amount of $694,895.04 to the County <br />for all utility relocations per City prepared construction documents. The Engineer's Estimate has been <br />reviewed and accepted bythe County's Public Works Engineering Division. <br />The purpose of this 'Utility Work by Highway Contractor Agreement' is to allow the Contractor selected by <br />the County to perform work on City of Vero Beach Water and Sewer facilities within the 43rd Avenue (12th <br />Street to 18th Street) project limits and mitigate any potential schedule impacts due to utility relocation. <br />This Project is scheduled to start construction in fall of 2024. <br />d11JU71. re <br />The City of Vero Beach will pay the County $694,895.04. These funds will be deposited into Optional Sales <br />Revenue/Reimbursements-City of Vero Beach/43rd Ave -Ped Access 12th -18th -Acct# 315038-369940-22027. <br />The expenses for the project are budgeted in Optional Sales Tax/43rd Ave -Ped Access 12th -18th, Account # <br />31521441-066510-22027. <br />C:\Granicus\Legistar5\L5\Temp\e8c10a30-f560-4246-a 354-60b308f9cf9d.doc 180 <br />
The URL can be used to link to this page
Your browser does not support the video tag.