|
bECTIOiv & PEX", 0 SCOM ASST 'i'1 ONS do tig this SGoPOmoo ,
<br />CAlrepresentstolheiCLIENT lathe folkv ng assumptioft-bM been made andtW4040M,
<br />tt assumptions *amt"
<br />GAY%
<br />" `figs-mesal da a
<br />design plans
<br />kdogoo in ft pojott pta* Application p0oft. *6 shall not be the responsibility of
<br />&e D ON TUK Addltiooal services tom': is as needed Ar,perrnitting can be
<br />PWVkW as an *WOl t as a se T* sow, lw"PW4
<br />•
<br />In, poperatim -oftt final design plans, #%€" V' tW: *%,Vb t
<br />theact
<br />� staff~
<br />• This Scopo of SwAcw specifically i des preparation 1 owaift
<br />descriptions, sttuotttrarl, madodaid, 61UUM4 landsca ,, Od 0MW0ftW Vftt:.
<br />• Wetland plantidesign drawings, plant r^and installation will be provided by others.
<br />• Civil engineering design and permitting fees for off-she improvements, such as
<br />access or utiles► line extensions, are not included wif tbisproposal.
<br />• Pitting for dispol of any ext , on-site hazardo I` industrial ve'mat, or
<br />any mer underpouA uuforesm i es is not ,included wit. his proposal.
<br />+ testing isnot itWlt d in t posal and would be oonsidered as an ***OwW
<br />swvke, if reT,4md br cerement design.
<br />M 000truction sorvicas Wod t u7t'. ted 'the r
<br />p epar$U of c�onstructi "
<br />dements, contractot bWfin& mspectioavr4joft +ttoustrn pt � a
<br />and final cerfAfications are not included vh& tis proposal but am be ,proviid+ as an
<br />additionalamn4ce as a separate scope as required,
<br />St COMPENSAMN
<br />The prVmd she of services wfllbe lit 4 tT TO : bogs auti tvaiao
<br />monthly b=4 on work perfonned ite tilt" each took
<br />Task to Site' annfng desig ,. , ;.,..a.«., , .:f.,. ;. ,,... ;,, •.. »520,700.00
<br />'lask2—Proet cost/phasing and 90% ,,,w,;,,,;,,„,„
<br />Task 3 —Final design revisions, draf#i Vis„;; $5,075.00
<br />Task 4 - Reimbursable Expenses.....,....«,..�„ (3,500.00
<br />TOT .. $39,445.00
<br />
|