Laserfiche WebLink
bECTIOiv & PEX", 0 SCOM ASST 'i'1 ONS do tig this SGoPOmoo , <br />CAlrepresentstolheiCLIENT lathe folkv ng assumptioft-bM been made andtW4040M, <br />tt assumptions *amt" <br />GAY% <br />" `figs-mesal da a <br />design plans <br />kdogoo in ft pojott pta* Application p0oft. *6 shall not be the responsibility of <br />&e D ON TUK Addltiooal services tom': is as needed Ar,perrnitting can be <br />PWVkW as an *WOl t as a se T* sow, lw"PW4 <br />• <br />In, poperatim -oftt final design plans, #%€" V' tW: *%,Vb t <br />theact <br />� staff~ <br />• This Scopo of SwAcw specifically i des preparation 1 owaift <br />descriptions, sttuotttrarl, madodaid, 61UUM4 landsca ,, Od 0MW0ftW Vftt:. <br />• Wetland plantidesign drawings, plant r^and installation will be provided by others. <br />• Civil engineering design and permitting fees for off-she improvements, such as <br />access or utiles► line extensions, are not included wif tbisproposal. <br />• Pitting for dispol of any ext , on-site hazardo I` industrial ve'mat, or <br />any mer underpouA uuforesm i es is not ,included wit. his proposal. <br />+ testing isnot itWlt d in t posal and would be oonsidered as an ***OwW <br />swvke, if reT,4md br cerement design. <br />M 000truction sorvicas Wod t u7t'. ted 'the r <br />p epar$U of c�onstructi " <br />dements, contractot bWfin& mspectioavr4joft +ttoustrn pt � a <br />and final cerfAfications are not included vh& tis proposal but am be ,proviid+ as an <br />additionalamn4ce as a separate scope as required, <br />St COMPENSAMN <br />The prVmd she of services wfllbe lit 4 tT TO : bogs auti tvaiao <br />monthly b=4 on work perfonned ite tilt" each took <br />Task to Site' annfng desig ,. , ;.,..a.«., , .:f.,. ;. ,,... ;,, •.. »520,700.00 <br />'lask2—Proet cost/phasing and 90% ,,,w,;,,,;,,„,„ <br />Task 3 —Final design revisions, draf#i Vis„;; $5,075.00 <br />Task 4 - Reimbursable Expenses.....,....«,..�„ (3,500.00 <br />TOT .. $39,445.00 <br />