My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/09/2024
CBCC
>
Meetings
>
2020's
>
2024
>
04/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 11:16:32 AM
Creation date
5/16/2024 10:57:47 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/09/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consent Item <br />Indian River County, Florida <br />Department of Utility Services <br />Board Memorandum <br />Date: February 13, 2024 <br />To: Indian River County Board of County Commissioners <br />Through: John A. Titkanich, Jr., County Administrator <br />Sean C. Lieske, Director of Utility Services <br />From: Howard G. Richards, PE, Manager—Capital Projects <br />Prepared by: Harrison Youngblood, PE, Utilities Engineer, Utility Services <br />Subject: Sam's Hobby Barn Developer's Agreement <br />Background: <br />Indian River County Department of Utility Services (IRCDUS) would like to enter into an agreement with the <br />developer, Samuel F. Gagliano of Sam's Hobby Barn, for the cost sharing of upsizing the off-site 4 -inch <br />diameter sewer force main to an 8 -inch diameter sewer force main. IRCDUS directed the developer to <br />upsize to an 8 -inch diameter sewer force main along Old Dixie Highway SW, approximately 240 linear feet <br />from approximately 950 Old Dixie Highway SW to 980 Old Dixie Highway SW. The total cost of the project is <br />outlined in the Utility Cost Estimate attached to the developer's agreement, which totals $11,286.00. The <br />developer shall cover the estimated cost of constructing a 4 -inch sewer force main, which is $4,555.20, with <br />Indian River County covering the remaining cost difference between the 4 -inch and 8 -inch sewer force main <br />construction materials cost, which is $6,730.80. The developer's share is based on the cost that they would <br />have incurred had they only been required to connect their development. <br />Funding: <br />Funding in the amount of $6,730.80 for the project will be accounted for in the Impact Fee/WIP/Sam's <br />Hobby Barn FM Upgrade account, number 472-169000-24506. Funds for this project are derived from <br />Utilities capital funding. Utilities capital funding is generated from impact fees. Furthermore, new <br />growth has created the need for the expansion or construction of the facilities, and that new growth will <br />benefit from the expansion or construction of the facilities. <br />Description <br />Account Number <br />Amount <br />Impact Fee/WIP/ Sam's Hobby Barn FM <br />472-169000-24506 <br />$6,730.80 <br />Upgrade <br />Recommendation: <br />Staff recommends that the Board of County Commissioners approve Sam's Hobby Barn Developer's <br />Agreement with the County and authorize the Chairman to execute the agreement to reimburse Samuel <br />F. Gagliano in the amount of $6,730.80 for the work performed in the agreement. <br />Page 1 of 2 <br />233 <br />
The URL can be used to link to this page
Your browser does not support the video tag.