Laserfiche WebLink
?W1 <br />Consent Item <br />Indian River County, Florida <br />Department of Utility Services <br />Board Memorandum <br />Date: March 25, 2024 <br />To: Indian River County Board of County Commissioners <br />Through: John A. Titkanich, Jr., County Administrator <br />Sean C. Lieske, Director of Utility Services <br />From: Howard G. Richards, PE, Manager—Capital Projects <br />Prepared by: Harrison Youngblood, PE, Utilities Engineer <br />Subject: FDOT Utility Work by Highway Contractor Agreement for Utilities Relocation on <br />CR-510/85th Street from CR -512 to 87th Street <br />Descriptions and Conditions: <br />The Florida Department of Transportation (FDOT) has plans to widen County Road 510 (CR -510) beginning at <br />CR -512 to 58th Avenue. The approximately 5.22 miles of existing two-lane roadway will be widened to a four - <br />lane roadway divided with curb and gutter. The proposed roadway improvements will include drainage <br />structures in the form of curb inlets approximately every 500 linear feet. <br />The Indian River County Department of Utility Services (IRCDUS) owns and operates two large water and <br />wastewater mains within the existing CR -510 right-of-way (ROW). Specifically, there is a 12 -inch PVC force <br />main along the south side and a 16 -inch water main along the north side of CR -510. The force main conveys <br />domestic wastewater from multiple locations including Sebastian River High School, Treasure Coast <br />Elementary, parts of Sebastian and flows generated within the City of Fellsmere. The water main provides <br />potable water to these same locations including Vero Lake Estates, provides looped water service and is a <br />major transmission main used for fire flow purposes. <br />On February 28th, 2020, the Indian River County Board of County Commissioners (BCC) entered into two (2) <br />separate Utility Design by FDOT Consultant Agreements for the design phase of CR-510/85th Street from West <br />of 82nd Avenue to 58th Avenue and CR-510/85th Street from CR -512 to West of 82nd Avenue. <br />Analysis: <br />During the design phase of the project many conflicts arose regarding the extension of the proposed reuse <br />line from 66th Ave to CR -512 along the CR -510 corridor. Most of the reuse main conflicts were denoted on <br />the portion of the project where CR -510 changes direction from an easterly/westerly roadway to a <br />north/south roadway. To mitigate the conflicts that arose around the extension of the reuse main, IRCDUS <br />requested that the reuse extension of the project stop just east of the Treasure Coast Elementary school <br />245 <br />