My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/23/2024
CBCC
>
Meetings
>
2020's
>
2024
>
04/23/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2024 3:27:33 PM
Creation date
5/16/2024 2:48:31 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/23/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1- WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The proposed project includes roadway reconstruction from an existing dirt road <br />to a paved two-lane highway along 90th Avenue from 13th Street SW to Oslo Road. <br />The proposed project includes the roadway reconstruction of an existing dirt road <br />to a paved two-lane highway along Oslo Road from 90th Avenue to approximately <br />1,100 feet west of 86th Avenue SW. The proposed drainage improvements will also <br />include the construction ofswales, installation of culverts, and installation drainage <br />structures throughout the corridor. The work will include the installation of 112 <br />linear feet of an 84 -inch reinforced concrete pipe in Indian River Farms Water <br />Control District (IRFWCD) sublateral D-4 canal. Construction shall begin by June <br />1, 2024, with final completion by 2128/2025. <br />ARTICLE 2 - THE PRC�IECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: OSLO ROAD AND 90TH AVENUE ROADWAY IMPROVEMENT <br />County Project Number: IRC -2215 <br />Bid Number: 2024015 <br />Project Address: Olso Road and 90th Avenue, Vero Beach, FL 32968 <br />ARTICLE 3 - ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and <br />will act as OWNER's representative, assume all duties and responsibilities, and have the <br />Agreement (Public Works) REV 04-07 - 00520 - 2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\2215 90th Ave and Oslo Rd Corridor Improvments\1-Admin\Agenda Items\Award of Bid\Sample Agreern445 <br />
The URL can be used to link to this page
Your browser does not support the video tag.