My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/23/2024
CBCC
>
Meetings
>
2020's
>
2024
>
04/23/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2024 3:27:33 PM
Creation date
5/16/2024 2:48:31 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/23/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and each of the activities must be completed before its successor can begin. A slippage in only one the <br />activities potentially delays all activities down line from it. <br />The Off-site Well Modifications were delayed by deteriorated optic cables that needed to be replaced. <br />Multiple meetings were held which ultimately resulted in modifications to the fiber optic cables. The <br />final solution was to replace portions of existing fiber to make the SCADA system reliable. Since that <br />time, the work to complete these four wells has been scheduled. Two of them are now completed <br />including the installation of the associated new control panels. The remaining two wells are scheduled <br />for CC Controls and Paragon Electric to complete on Monday 06 -March -2024 and the remaining has <br />been scheduled for Monday 13 -March -2024. <br />R/O Nano -Filter R/O Skid Work: <br />The work for the demolition of the first existing (R/O Skid) Nano -Filter is completed and is reported as <br />functioning as intended. <br />The delays at the second R/O skid installation were extensive: <br />- out of sequence work to repair the Owners emergency leak. <br />- Delays in receipt of Aerex stainless piping. <br />- Delays by specified but malfunctioning R/O permeate flow meter(s). <br />- Delays by the denial of multiple requests to shut down the plant to tie in the R/O system. <br />- This was followed by delays when Harn left the site to go to another available project. <br />- Delays caused by a malfunctioning feedwater pump. <br />- These issues have now all been corrected, and the filter membrane loading is now scheduled for <br />04 -March -2024. <br />- Because this project was designed in series and not in parallel, the delays to the second R/O skid <br />also cause delay to the third and fourth skids and the Feed pump replacements and the Feedwater Pipe <br />replacement and on down the line. We are working with the Engineer and the Owner to streamline the <br />removal and replacement of these final skid(s). <br />Regarding Stainless Steel Pipe Delivery and Installation: <br />The project has been severely delayed by the absence of the stainless-steel pipe delivery(s). We now <br />have delivery of this stainless-steel piping for all areas on the schedule. TLC has also intentionally <br />increased its labor force after receiving this piping and is currently installing the stainless piping systems. <br />Demolition and Replacement of the (RWB) Raw Water blend Piping: <br />This was part of the delayed pipe delivery and was discussed above to correct the Emergency <br />Owner leak. The piping is installed and operational but has some accessories that need to be replaced. <br />These accessories are on order and are included on the updated Finishing schedule for completion. <br />Clean In Place System: <br />144 <br />
The URL can be used to link to this page
Your browser does not support the video tag.