Laserfiche WebLink
The (CIP) Clean in Place system orders are being written and shop drawings are forthcoming. The <br />materials for this work are on site and installation of the Mezzanine support system will also be on <br />the updated Finishing Schedule. <br />The Acid Feed system in the Finishing Schedule is installed and is in operation. <br />The 4000 Gallon Bulk Storage tank is installed and will be scheduled for start-up in the updated <br />Finishing Schedule. <br />The Co2 system final start up and tank filling is in process of being scheduled. TLC requested 2 <br />start-up dates from the Manufacturer (Tomco) for the Owner to choose from in an email dated 29 - <br />February. We are confident that this work will be completed in the next few weeks. <br />TLC has not left the site since the day we mobilized. We have enjoyed a good working relationship <br />with the Plant Superintendent and with the Owner and Engineer which is sometimes difficult on <br />contracts that last longer than 1 year. We ask that the Owner provide an extension of time and <br />avoid the Liquidated Damages route on this project. That route would be a slippery slope knowing <br />what we have all experienced over the life of this project regarding delays beyond our control and <br />especially on a phased project such as this one. <br />TLC has written many "do better letters" to suppliers and subcontractors over the life of this project <br />and have had some heated discussions informing them to execute their work even in the face of the <br />delays that we are all experiencing. <br />TLC has asked only for additional time on this project. We have already endured and continue to <br />pay a heavy price for the extended overhead, supervision and even for extra work that the Owner <br />has never received an invoice for. TLC is committed to completing the remaining work on this <br />project as efficiently and as quickly as possible and ask that the Owner provide an extension of time <br />for this request. <br />We look forward to the safe and expeditious closure to this project and appreciate any assistance <br />the Owner and Engineer can offer. <br />Sincerely, <br />TLC Diversified, Inc. <br />Com' <br />John Elder <br />Project Manager <br />PALMETTO WEST PALM BEACH TAMPA. 941.722.0621 <br />Corporate Office 7233 Southern Blvd 12814 Dupont Circle <br />2719 17th St. East Suite B-1 Building B, Suite 4-A jai 941.7192 <br />Palmetto, FL 34221 West Palm Beach, FL 33413 Tampa, FL 33626 CG C041816 CU C053963 <br />