My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/23/2024
CBCC
>
Meetings
>
2020's
>
2024
>
04/23/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2024 3:27:33 PM
Creation date
5/16/2024 2:48:31 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/23/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M J MASTELLER & MOLER, INC. <br />M1 — CIVIL ENGINEERS — <br />EXHIBIT A <br />165527 1h Stre <br />Ste. 2, Vero Beach, FL 32960 <br />(772) 567-5300 <br />The Indian River County Parks, Recreation and Conservation Department plans to install a restroom <br />building adjacent to the existing playground area located just north of the softball diamonds at the Fran <br />B. Adams North County Regional Park (WW Ranch Rd & C.R. 512). Under Work Order 2, Masteller & <br />Moler, Inc. (MM) performed engineering design and preparation of construction plans, site planning and <br />project permitting, and is authorized to perform bidding services and construction administration & <br />observation services. Work Order 2 included provisions for a pre -fabricated restroom building to be <br />installed. Amendment 1 to Work Order 2 authorized revising plans and permitting reacquisition for a <br />concrete masonry unit (CMU) block building designed by one of the County's Architectural / MEP <br />consultants in lieu of the pre -fabricated building. Amendment 2 to Work Order 2 authorized revising <br />plans and permitting reacquisition for a revised CMU block building. <br />Under Amendment 2 to Work Order 2, the plans were revised for the new restroom building and the <br />project was fully permitted for construction. Amendment Number 3 to Work Order 2 proposes <br />additional construction administration and observation services for the CMU block building proposed. <br />Amendment Number 3 to Work Order 2 does not amend the Scope of Work as listed under Work Order <br />2, Task H, but will require more labor hours to perform the services than included in the original Work <br />Order 2 due to the change in building types. <br />Scope of Work: <br />No change to Work Order 2 <br />Fee Schedule: <br />Original Fee <br />Task H — Construction Administration Services $ 4,510.00 <br />Additional Fee Requested with Amendment 3 to Work Order 2 <br />Task H — Construction Administration Services $ 3,130.00 <br />Total, Revised Task H Fee $ 7,640.00 <br />Time Schedule: <br />1. Schedule— No Change to Work Order 2 <br />2. Deliverables— No Change to Work Order 2 <br />Page 1 of 1 76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.