Laserfiche WebLink
Quintin Bergman <br />April 11, 2024 <br />Page 2 <br />A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />RYAN L. BUTLER, CLERK <br />beach management alternatives for each sector and the permitting requirements, <br />environmental implications, and possible funding mechanisms to implement the <br />alternatives; and participate in one Board of County Commissioners (BOCC) meeting to <br />present the results of the BPP update. This study's findings will provide the COUNTY with a <br />robust BPP for each of its coastal sectors. <br />ASSUMPTIONS <br />The CONSULTANT Team made several assumptions in developing this Scope of Work and <br />the associated fees for the project. The following assumptions and those noted throughout <br />this Scope of Work inform the proposed level of effort and associated costs: <br />■ This Scope of Work excludes detailed modeling, engineering design, permitting, <br />construction administration, and any other service not explicitly detailed herein. <br />■ The COUNTY will assist in collecting background data that are not publicly available. <br />Relevant data include survey information, related reports, water -level data, wave data, <br />dredge history, applicable photographs, etc. The CONSULTANT will have the right to <br />reasonably rely on the accuracy and validity of such documentation and data. The <br />COUNTY agrees to indemnify and hold the CONSULTANT harmless from any loss, <br />damage, or liability arising out of any errors, omissions, or inaccuracies in such <br />documentation and/or data and where such documentation and/or data do not conform <br />to normal and customary standards. <br />■ The CONSULTANT does not guarantee, warranty, or otherwise ensure that regulatory <br />agencies will authorize the proposed management strategies. <br />EXHIBIT A SCOPE OF WORK <br />TASK 1 — DATA COLLECTION AND REVIEW <br />Task 1 entails collecting and reviewing existing information pertinent to the Indian River <br />County coastline. The CONSULTANT Team will coordinate with COUNTY staff to finalize the <br />sector divisions to be used throughout the BPP update. The CONSULTANT will analyze the <br />sector areas from previous BPPs and advise and discuss with the COUNTY during this task if <br />changes may provide clarity. For each sector, the assessment will note the community and <br />user profile, COUNTY -identified public access points, current public and private uses, and <br />management activities. <br />The CONSULTANT Team will review literature related to the coastal processes for this region <br />and summarize major findings. We will obtain publicly available information about the <br />Indian River County beaches—potential information sources include but are not limited to: <br />• Florida Department of Environmental Protection (FDEP). <br />• US Army Corps of Engineers (USACE). <br />■ Federal Emergency Management Agency (FEMA). <br />■ National Oceanic and Atmospheric Administration (NOAA). <br />