My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-114
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2024 10:57:06 AM
Creation date
6/17/2024 10:55:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/01/2024
Control Number
2024-114
Agenda Item Number
Signed by County Administrator
Entity Name
MBV Engineering, Inc
Subject
Engineering Services Work Order No. 4 for Professional Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />RYAN L. BUTLER, CLERK <br />B. County Reviews <br />The CONSULTANT will attend two (2) progress review meeting with the EOC staff, one at the 50 <br />percent level of construction design completion, and one at 100 percent level of completion. A <br />single set of review comments shall be provided to CONSULTANT prior/or after the review <br />meetings, as applicable. This task includes revisions to plans from the EOC review within <br />reasonable scope of the project. <br />C. Permitting <br />The Consultant will prepare the following permit applications and associated submittals for the <br />following agencies. CONSULTANT will provide revised plans and respond to agency permit <br />comments as applicable. Note: Permit Application packages to the agencies will be submitted <br />after addressing the COUNTY's 50 percent review comments. <br />• IRC Major Site Plan <br />• IRC Land Clearing <br />• IRC Tree Removal <br />• IRC Concurrency (Conditional and Final) <br />• IRC Stormwater <br />• IRC Utilities <br />• IRC Fire Review <br />• SJRWMD ERP Permit Modification <br />• IRFWCD Permit Modification <br />• FDEP Water Exemption <br />• FDEP Sewer Exemption <br />The CONSULTANT will prepare all necessary applications and fee requests and provide to COUNTY for <br />signature and check processing. Permit Application Fees will be paid for by COUNTY. <br />Task 3: Cost Estimate <br />The CONSULTANT will prepare an Engineer's Opinion of Probable Costs at 100 percent level of design <br />completion. <br />Task 4 — Reimbursable <br />This task includes costs and expenses associated with the project. Permit application fees are not <br />Included In this Task and will be paid directly by the Owner. MBV will coordinate with the agency and <br />Owner on the required fee and provide to Owner the applicable fee schedules / information from the <br />agency. <br />SCHEDULE <br />Upon authorization to proceed by the COUNTY, the above-described services will be provided based <br />on the following schedule: <br />• Preliminary Plans and Meetings 45 days from Notice to Proceed <br />• 50% Construction Plans 45 days from receipt of IRC Pre -Application Comments <br />• 100% Construction Documents 120 days from the Permit Applications Submission <br />
The URL can be used to link to this page
Your browser does not support the video tag.