My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/07/2024
CBCC
>
Meetings
>
2020's
>
2024
>
05/07/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2024 2:51:32 PM
Creation date
6/20/2024 2:44:36 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/07/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quintin Bergman <br />April 11, 2024 <br />Page 5 <br />TASK 4 — STORM VULNERABILITY AND RESILIENCE ANALYSIS UPDATE <br />Task 4 entails analyzing the shoreline position (Task 2) and how it relates to the upland <br />infrastructure along the coastline. The CONSULTANT Team will classify different reaches or <br />areas within sectors that have common features based on upland infrastructure, including <br />analyzing parcel databases. The CONSULTANT Team will leverage past efforts and use the <br />2015 and 2019 BPPs' SBEACH modeling efforts to determine how the beach's storm <br />response varies along the coast and incorporate the response features into a vulnerability <br />analysis of the upland infrastructure. The risk analysis will incorporate four vulnerability <br />parameters: <br />1. Shoreline encroachment. <br />2. Elevation change. <br />3. Historical erosion rates. <br />4. Storm response. <br />The study will discuss these risks and how they affect the protective "buffer" that the coast <br />provides the upland infrastructure. The study will also evaluate the recreational value of the <br />beach and the losses associated with shoreline retreat or storm damage if the coastal <br />protection fails. <br />Deliverables: <br />One Technical Memorandum will summarize the major findings and include a matrix of <br />parameters that influence beach vulnerability (elevations/volume information, SBEACH <br />storm response, erosion rates, etc.). The CONSULTANT Team will implement COUNTY <br />comments and revisions into the final Technical Report. <br />TASK 5 — BEACH MANAGEMENT ALTERNATIVE DEVELOPMENT <br />Task 5 entails investigating beach management measures and will include, but will not be <br />limited to: <br />■ No action. <br />■ Managed Retreat/Strategic <br />Realignment <br />■ Beach/dune nourishment. <br />■ Nearshore placement. <br />■ Vegetative planting and sand fencing. <br />■ Groins. <br />■ Breakwaters. <br />■ Seawalls. <br />■ Geotubes <br />■ Revetments. <br />■ Submerged artificial reefs. <br />The above list provides guidance. The CONSULTANT will analyze up to 15 beach <br />management measures. The CONSULTANT Team will provide a brief overview of each <br />management alternative and a rough -order -of -magnitude cost. The Technical Memorandum <br />will discuss the management measures and note their feasibility along the Indian River <br />County shoreline and will include qualitative benefits, data shortcomings, design/permitting <br />103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.