My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/07/2024
CBCC
>
Meetings
>
2020's
>
2024
>
05/07/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2024 2:51:32 PM
Creation date
6/20/2024 2:44:36 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/07/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br />a�V Eftfp <br />INDIAN RIVER COUNTY, FLORIDA CONSENTAGENDA <br />AGENDA ITEM BCC Meeting 05-07-2024 <br />s �t0FRt � Deputy County Administrator / <br />Sandridge Golf <br />Date: April 29, 2024 <br />To: The Honorable Board of County Commissioners <br />Thru: John A. Titkanich Jr., County Administrator <br />From: Michael C. Zito, Deputy County Administrator <br />Subject: Request for Work Order #11 for Sandridge Restroom Utility Improvements <br />BACKGROUND: <br />In 2018, Sandridge Golf Club installed a prefabricated concrete restroom between holes #4 and #5 <br />on the Lakes Golf Course. At the time, the Parks Division ran a 1" water line, however, the water <br />pressure from this 1" line is not enough once it gets to the building to supply the proper pressure <br />for the toilets to flush. Staff combatted the issue by installing two different pumps to increase the <br />water pressure to the building so that the toilets could be used but have replaced those pumps three <br />times already. A drain field and septic system was also installed at that time to service the <br />building. <br />Parks recently finished a project in Hobart Park where a 4" sewer line and a 2" water line was <br />installed from 77`h Street to the new pavilion in Hobart Park. Staff are proposing to connect to this <br />new 4" sewer line to the restroom as well as the 2" water line with its own water meter. <br />Kimley-Horn and Associates, Inc engineered the Hobart Park Project and has submitted a quote for <br />$36,000.00 to prepare civil plans, design the County lift station and assist with permitting. Staff will <br />issue a solicitation, to be presented to the Board for award, for the installation of the lift station, as <br />well as the 2" water line and 4" water line. <br />FUNDING: <br />Funding, in the amount of $36,000, for Work Order #11 will be recorded in the <br />Sandridge/WIP/Lakes No. 5 Restroom Water & Sewer account, number 418-169000-24020. <br />Description ==Account <br />Number <br />Amount <br />Sandrid e/WIP/Lakes No. 5 Restroom Water & Sewer <br />1 418-169000-24020 <br />$36,000.00 <br />RECOMMENDATION: <br />Staff respectfully requests that the Board of County Commissioners approve the Kimley-Horn and <br />Associates, Inc. proposal, and authorize the Chair to execute the Work Order 11; as well as allow <br />Staff to issue a solicitation, to be presented to the Board for award, for the installation of the lift <br />station, as well as the 2" water line and 4" water line. <br />80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.