My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/21/2024
CBCC
>
Meetings
>
2020's
>
2024
>
05/21/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2024 3:33:03 PM
Creation date
6/24/2024 9:27:30 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/21/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P.E. <br />22 April 2024 <br />Page 2 <br />Geosyntec personnel and a drilling subcontractor mobilized to the site the week of 9 October 2023 <br />for field activities related to the RAPM No. 4. Groundwater samples were collected using direct <br />push technology (DPT) drilling in the vicinity of the former source area and northwest of the <br />former source area. Data from the RAPM No. 4 field activities and next step recommendations <br />were submitted to FDEP at the same time as the 2023 Annual Groundwater Monitoring Report <br />(GMR). The Annual Pollution Remediation Liabilities Evaluation was submitted to IRC on 31 <br />October 2023. The winter 2023 semi-annual groundwater monitoring event was completed the <br />week of 4 December 2023. Due to inconsistencies in the groundwater analytical data reported in <br />December 2023 at three monitoring wells, Geosyntec personnel remobilized to the Site on 6 and <br />7 February 2024 to redevelop the wells and collect confirmation groundwater samples. This <br />additional effort is covered under the current authorization. The 2023 Annual GMR was submitted <br />to FDEP on 28 February 2024 and recommended to significantly reduce the plume monitoring <br />well network. Investigation -derived waste (IDW) generated during 2023 and 2024 field activities <br />and containerized in a 55 -gallon polyethylene drum was removed and disposed of by a licensed <br />subcontractor in March 2024. <br />Work Reflected on Enclosed Invoice <br />Reimbursable expenses ($862.50) reflected on the enclosed invoice are associated with <br />subcontractor costs for offsite transport and disposal of six 55 -gallon drums of nonhazardous <br />liquids. <br />CLOSURE <br />Geosyntec appreciates the opportunity to provide services to Indian River County. If you have any <br />questions regarding this correspondence, please feel free to contact me at (850) 483-5102. <br />Sincerely, <br />Crystal Wilson, P.G. (FL) <br />Senior Geologist <br />FR0766U/PR24016.docx <br />engineers I scientists I innovators <br />161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.