My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-236
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-236
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 11:57:10 AM
Creation date
7/12/2024 11:38:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/01/2000
Control Number
2000-236
Agenda Item Number
11.G.6.
Entity Name
William Glover, Inc.
Subject
Contract for Shooting Range Buildings
Includes Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />40 <br />e <br />SECTION 01020 <br />SCOPE OF WORK <br />PARTI-SCOPE <br />1.01 The work under this Contract consists of the construction of the Indian River County <br />Shooting Range. A 35 point pistol range, a 30 point rifle range, a 5 stand sporting clays <br />shotgun range, a 10 point airgon range, and a single point archery range. <br />1.02 It is the intent of the Board to award all or parts of the project in order to result in completed <br />and usable portions of project. <br />1.03 The Board will obtain the County site plan approval and permits from the 'Water <br />Management District for stormwater prior to commencement of construction. <br />1.04 The Contractor shall secure all other permits required for the work. <br />PART 2 - ORDER OF WORK <br />2.01 The work is intended to be prosecuted in an orderly manner, such that the project is <br />completed as early as possible to allow the Board to expedite the opening of the range. <br />2.02 It is expected that the project will not proceed until all permits by the permitting agencies <br />have been issued. <br />PART 3 - TIMES OF COMPLETION <br />3.01 Board will issue a Notice -to -Proceed to the CONTRACTOR when the project may begin. <br />3.02 The entire project shall be completed within 120 clays from date of Notice -to -Proceed. The <br />project construction will not begin until all permits are in hand. <br />END OF SECTION <br />01020- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.