My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-236
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-236
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 11:57:10 AM
Creation date
7/12/2024 11:38:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/01/2000
Control Number
2000-236
Agenda Item Number
11.G.6.
Entity Name
William Glover, Inc.
Subject
Contract for Shooting Range Buildings
Includes Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-1 <br />• <br />40 <br />1. For Physical Education Fields, and Other Grassed or <br />Landscaped Areas: <br />a. Within 2 feet of the surface of the indicated grade,. <br />limit rock size to 3 inches. <br />b. Below 2 feet of the surface of indicated grade, limit <br />rock size to 12 inches. <br />C. Deeper than 6 feet limit rock size to 24 inches. <br />2. For Buildings: <br />a. Within 2 feet of the surface of indicated grade, limit <br />rock size to 2 inches. <br />b. Below 2 feet of the surface of indicated grade limit <br />rock size to 6 inches. <br />B. "Unsatisfactory Materials" include materials other than "Satisfactory <br />Fill Materials." Materials of any classification determined by testing <br />laboratory as too wet or too soft for providing a stable foundation for <br />structure, paving, and walks will be classified as "unsatisfactory". <br />C. Degree of Compaction: Required compaction is expressed as a <br />maximum density obtained by test procedures of ASTM D1557-91. <br />D. Building Area: The area bounded by lines not less than 4 feet <br />beyond the outside line of the building perimeter footings. <br />Increase the 4 foot dimension by 1 foot for each foot of <br />excavation depth required exceeding 4 feet. <br />1.05 SUBMITTALS <br />A. Submit the following before starting work: <br />1. Compaction Machinery Specifications. <br />2. Compaction Tests (by the Owner). <br />3. Soil Classification Tests. <br />4. Stabilized Subgrade Composition and Density. <br />5. Testing Laboratory (by the Owner). <br />1,06 SITE CONDITIONS <br />A. Determine location and nature of work, character of equipment, and <br />facilities needed for performance of work, general, and local <br />conditions prevailing at site, and other matters affecting work under <br />this contract according to Instructions to Bidders and General <br />Conditions. <br />0XIDN <br />,.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.