Laserfiche WebLink
. M Item <br />�iw;ft ft-crrinicnn f7inin'EiEy llnit Unit price Extension <br />Al <br />Provide Super Trap Bullet Containment <br />150 <br />LF <br />599$.77 <br />$149,814.90 <br />linclude cost of sewer pifrom building to tank. <br />System on Pistat Range 25 -yd. Backstop <br />include cost for sheet metal facing. <br />22 <br />Dedication and Range Rules signs. <br />23, <br />25'7 <br />Y28 <br />A? <br />Provide SuperTrap Bullet Containment <br />?25 <br />LF <br />$1,000.38 <br />5225,085.50 <br />jInclude cost of fertilizer and vaterina in the unitrice ofthe grassing. <br />System on Rifle Range 1170 -yd. and 200- <br />d. Backstops <br />3 <br />Substitute EME concrete modular building <br />I <br />EA <br />$157,725.00 <br />$157,725.00 <br />kA4 <br />for refabdcated modular buildin <br />Provide 25 -foot Flaa Ee <br />3 <br />EA <br />5,970.18 <br />52,910.53 <br />10101 Alternates] <br />Total Combined Bic! 51,144,784.54 <br />Fay Item Footnotes <br />2,5,7, Include costs for lights, fans, benches, Fire extinguishers, water coolers, dry wells, and all <br />13.16 other otherwise not individually itemized items to provide a complete building with the <br />features shown on the dra\%inLS. <br />3_Concrete <br />pads are included in the uantity for concrete walkways <br />9 <br />nclude cost of concrete p2les. <br />11 <br />linclude cost of sewer pifrom building to tank. <br />14 <br />include cost for sheet metal facing. <br />22 <br />Dedication and Range Rules signs. <br />23, <br />25'7 <br />Y28 <br />nclude cost of 4% 5', and 6' single leaf gates in the unit price ol'the fencing. <br />C©j,D RA dGk ..." si Ln on back of Dedication si Ln <br />35 <br />linclude cost of fertilizer and watering in the unit price ofthe assin . <br />36 <br />jInclude cost of fertilizer and vaterina in the unitrice ofthe grassing. <br />Bit$ PROPOSAL <br />IBP -4 <br />