My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-236
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-236
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 11:57:10 AM
Creation date
7/12/2024 11:38:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/01/2000
Control Number
2000-236
Agenda Item Number
11.G.6.
Entity Name
William Glover, Inc.
Subject
Contract for Shooting Range Buildings
Includes Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER shall have no responsibility to review or check the BIDDER'S compliance with <br />the "french Safety Standards. <br />7, The BIDDER has allocated and included in its bid the total amount of S-0— basrd on <br />the square feet of shoring to be used for compliance with shoring safety requirements and <br />intends to comply with said shoring requirements by instituting the following specific <br />method(s) of compliance on this Project:. <br />The detennination of the appropriate method(s) of compliance is the complete and sole <br />responsibility of the Excavation Contractor. Such methods will not be checked by the <br />OWNER or ENGINEER for accuracy, completeness or any other purpose. The OWNER <br />and ENGINEER shall have not responsibility to review or check the BIDDER'S compliance <br />with the Trench Safety Standards. <br />Is. The BIDDER, in submitting this bid, represents that it has obtained and considered all <br />available geotechnical information, has utilized said gcotechnical information and that, based <br />on such information and the BIDDER'S own infannation, the BIRDER has sufficient <br />knowledge of the Project's surface and subsurface site conditions and characteristics to assure <br />BIDDER'S compliance with the applicable Trench Safety Standards in designing the trench <br />safely system(s) for the Project. <br />lb <br />r <br />�t!.Y11 S1Ar>EniStti't' <br />r.t <br />BIDDER <br />By <br />4 r'1 <br />(SI rcJ <br />Position <br />or Title) <br />(Dale) <br />1 ti AN L) sL U b4oae me this �rdayof2090. <br />Sly Commission Expires: r11 1irt t'ri & <br />In I Pullic 1 <br />J,<, [h C KayFinam <br />*,rrM Ccmrdartan ccrtss51 <br />e'o+ra AM 21,:2= <br />lb <br />r <br />�t!.Y11 S1Ar>EniStti't' <br />r.t <br />
The URL can be used to link to this page
Your browser does not support the video tag.