My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-236
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-236
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 11:57:10 AM
Creation date
7/12/2024 11:38:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/01/2000
Control Number
2000-236
Agenda Item Number
11.G.6.
Entity Name
William Glover, Inc.
Subject
Contract for Shooting Range Buildings
Includes Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C] <br />i <br />4*0 Physical Conditions - Underground Facilities: <br />4.4 Shown or Indicated: The information and data shown or indicated in the Contract Documents with <br />respect to existing Underground Facilities at or contiguous to the site are based on information and <br />data furnished to OWNER or ENGINEER by the owners of such Underground Facilities or by <br />others. Unless it is otherwise expressly provided in the Supplementary Conditions: <br />4.4.1 OWNER and ENGINEER shall not be responsible for the accuracy or completeness of any <br />such information or data; and <br />4.4.2 CONTRACTOR shall have full responsibility for reviewing and checking all such <br />information and data, for locating all Underground Facilities shown or indicated in the <br />Contract Documents, fnr coordination of the Work with the owners of such Underground <br />Facilities during construction, for the safety and protection thereof as provided in paragraph <br />6.25 and repairing any damage thereto resulting from the Work, the cost of all of which will <br />be considered as having been included in the Contract Price. <br />Utilities: <br />4.5 The word facility as used in this subsection titled "Utilities" includes any pipe conveying gases or <br />liquids and appurtenances attached thereto; cables, conduits, wires, ducts and appurtenances; poles <br />and appurtenances; any of which may be buried below grade or installed at or above grade level. <br />A facility excludes irrigation pipes, service connections and traffic signal wiring. A service <br />connection is a pipe (excluding irrigation pipes), cable, wire, duet or conduit that is intended to <br />connect a facility with a user. The word Utility as used in this subsection titled "Utilities" refers to <br />the entity having legal ownership of the facility, service connection, irrigation pipe, or traffic signal <br />wiring. <br />4.6 The ENGINEER has endeavored to determine the existence of underground facilities at the site of <br />the work from the records of the utilities with known facilities in the vicinity of the work. The <br />position of these facilities as derived from such records are shown on the plans. Service <br />connections, irrigation pipes, and traffic signal wiring may not be shown on the plans. The <br />CONTRACTOR shall make his own investigations, including exploratory excavations and contact <br />with Utilities, to determine the exact locations and type of existing facilities, service connections, <br />irrigation pipes, and traffic signal wiring prior to commencing work in the area and shall be <br />responsible for any damage thereto. <br />4.7 With regard to paragraph 6.25, damage, injury, or loss resulting in whole or in part from the <br />CONTRACTOR's failure to locate and preserve a facility, service connection. irrigation pipe, or <br />traffic signal wiring shall under no circumstances be deemed attributable to the fault of the Drawings <br />or Specifications or to the acts or omissions of the OWNER or ENGINEER or anyone employed by <br />either of them or anyone for whose acts either of them may be liable. <br />4.8 With respect to underground facilities, no claim for a change in the contract price may be allowed <br />unless the CONTRACTOR discovers an underground facility which is not indicated or referred to <br />in the Contract Documents or which is in a position diftcring materially and significantly from that <br />indicated or referred to in the Contract Documents. If such discovery is made, the CONTRACTOR <br />shall promptly notify in writing the OWNER, ENGINEER and the Utility. The OWNER may make <br />changes in the alignment and grade of the work in accordance with the section titled "Changes in <br />the Work". <br />4.9 At no additional cost to the OWNER, the CONTRACTOR shall replace, remove, relocate, protect, <br />or temporarily maintain a facility which is not in a position differing materially and significantly <br />from that indicated or referred to in the Contract Documents. At no additional cost to the OWNER, <br />the CONTRACTOR shall adjust the top elevation of all valve boxes and manholes to match the <br />GENERAL CONDITIONS <br />GC - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.